Title: Initial progress in the first wall, blanket and shield engineering test program for magnetically confined fusion power reactors

Conference · · Proc. Symp. Eng. Probl. Fusion Res.; (United States)
OSTI ID:6482109

The first wall/blanket/shield (FW/B/S) Engineering Test Program (ETP) progresses from the planning stage into implementation during July, 1981. the overall background and scope have been described in detail in earlier reports. The program, generic in nature, comprises four test Program Elements (TPE'S) the emphasis of which is on defining the performance parameters for the Fusion Engineering Device (FED) and the major fusion device to follow FED. These elements are discussed here.

Research Organization:
Argonne Natl Lab, IL, USA
OSTI ID:
6482109
Report Number(s):
CONF-811040-; TRN: 83-007898
Journal Information:
Proc. Symp. Eng. Probl. Fusion Res.; (United States), Conference: 9. symposium on engineering problems of fusion research, Chicago, IL, USA, 26 Oct 1981