Title: 300 MW combined-cycle plant with integrated coal gasification

Abstract

The main obstacle to further expansion of the combined cycle principle is its lack of fuel flexibility. To this day, gas turbines are still limited to gaseous or liquid fuels. This paper shows a viable way to add a cheap solid fuel, coal, to the list. The plant system in question is a 2 X 150 MW combined-cycle plant of BBC Brown Boveri with integrated coal gasification plant of British Gas/Lurgi. The main point of interest is that All the individual components of the power plant described in this paper have proven their worth commercially. It is therefore not a pilot plant but a viable commercial proposition.

Authors:
Publication Date:
Research Org.:
BBC Brown Boveri and Cie., Ltd., Baden
OSTI Identifier:
6472259
Report Number(s):
CONF-840905-
Journal ID: CODEN: ASMSA
Resource Type:
Conference
Resource Relation:
Journal Name: Am. Soc. Mech. Eng., (Pap.); (United States); Journal Volume: 84-JPGC-GT-19; Conference: Joint power generation conference, Toronto, Canada, 30 Sep 1984
Country of Publication:
United States
Language:
English
Subject:
20 FOSSIL-FUELED POWER PLANTS; COAL; LURGI PROCESS; COMBINED-CYCLE POWER PLANTS; COMMERCIALIZATION; FUEL SUBSTITUTION; GAS TURBINE POWER PLANTS; COAL GASIFICATION PLANTS; COAL-FIRED GAS TURBINES; COST BENEFIT ANALYSIS; FOSSIL-FUEL POWER PLANTS; POWER RANGE 10-100 GW; POWER RANGE 100-1000 MW; STEAM TURBINES; CARBONACEOUS MATERIALS; COAL GASIFICATION; ENERGY SOURCES; FOSSIL FUELS; FUELS; GAS TURBINES; GASIFICATION; INDUSTRIAL PLANTS; MACHINERY; MATERIALS; POWER PLANTS; THERMAL POWER PLANTS; THERMOCHEMICAL PROCESSES; TURBINES; TURBOMACHINERY 200108* -- Fossil-Fueled Power Plants-- Fuels-- (1980-); 200102 -- Fossil-Fueled Power Plants-- Power Cycles

Citation Formats

Kehlhofer, R.H. 300 MW combined-cycle plant with integrated coal gasification. United States: N. p., 1984. Web.
Kehlhofer, R.H. 300 MW combined-cycle plant with integrated coal gasification. United States.
Kehlhofer, R.H. 1984. "300 MW combined-cycle plant with integrated coal gasification". United States. doi:.
@article{osti_6472259,
title = {300 MW combined-cycle plant with integrated coal gasification},
author = {Kehlhofer, R.H.},
abstractNote = {The main obstacle to further expansion of the combined cycle principle is its lack of fuel flexibility. To this day, gas turbines are still limited to gaseous or liquid fuels. This paper shows a viable way to add a cheap solid fuel, coal, to the list. The plant system in question is a 2 X 150 MW combined-cycle plant of BBC Brown Boveri with integrated coal gasification plant of British Gas/Lurgi. The main point of interest is that All the individual components of the power plant described in this paper have proven their worth commercially. It is therefore not a pilot plant but a viable commercial proposition.},
doi = {},
journal = {Am. Soc. Mech. Eng., (Pap.); (United States)},
number = ,
volume = 84-JPGC-GT-19,
place = {United States},
year = 1984,
month = 9
}

Conference:
Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that hold this conference proceeding.

Save / Share:
  • The advanced development of certain components and process steps is required although, world-wide a number of activities are carried out for the development of a hard coal-fired combined-cycle power plant with integrated coal gasification and demonstration projects are already available or planned. The named high efficiencies can only be achieved, if the design of components respectively process steps allows an exergetically high energy utilization.
  • This study investigates the use of molten nitrate salt thermal energy storage in an integrated gasification combined-cycle power plant allowing the facility to economically provide peak- and intermediate-load electric power. The results of the study show that an integrated gasification combined-cycle power plant with thermal energy storage can reduce the cost of coal-fired peak- or intermediate-load electric power by between 5% and 20% depending on the plants operating schedule. The use of direct-contact salt heating can further improve the economic attractiveness of the concept. 12 refs., 1 fig., 5 tabs.
  • This study investigates the use of molten nitrate salt thermal energy storage in an integrated gasification combined-cycle power plant allowing the facility to economically provide peak- and intermediate-load electric power. The results of the study show that an integrated gasification combined-cycle power plant with thermal energy storage can reduce the cost of coal-fired peak- or intermediate-load electric power by between 5% and 20% depending on the plants operating schedule. The use of direct-contact salt heating can further improve the economic attractiveness of the concept. 11 refs., 1 fig., 4 tabs.
  • The objectives of this report are to present the facility description, plant layouts and additional information which define the conceptual engineering design, and performance and cost estimates for the Texaco Integrated Gasification Combined Cycle (IGCC) power plant. Following the introductory comments, the results of the Texaco IGCC power plant study are summarized in Section 2. In Section 3, a description of plant systems and facilities is provided. Section 4 includes pertinent performance information and assessments of availability, natural resource requirements and environmental impact. Estimates of capital costs, operation and maintenance costs and cost of electricity are presented in Section 5.more » A Bechtel Group, Inc. assessment and comments on the designs provided by Burns and Roe-Humphreys and Glasgow Synthetic Fuel, Inc. are included in Section 6. The design and cost estimate reports which were prepared by BRHG for those items within their scope of responsibility are included as Appendices A and B, respectively. Appendix C is an equipment list for items within the BGI scope. The design and cost estimate classifications chart referenced in Section 5 is included as Appendix D. 8 references, 17 figures, 15 tables.« less
  • The facility description, plant layouts, and additional information which define the conceptual engineering design, performance, and cost estimates for the Westinghouse Integrated Gasification Combined Cycle IGCC power plant which utilizes high-sulfur coal as fuel and achieves a sulfur removal level of 90% (base case). An assessment of the impacts of design changes to achieve more stringent sulfur removal levels (95 and 99.5%) and the impact of using low-sulfur coal on the results of the base case conceptual engineering studies, plant layouts, and cost estimates. Following the introductory comments, the results of the Westinghouse IGCC power plant study are summarized inmore » Section 2. In Section 3, a description of plant systems and facilities is provided for the base case. Section 4 includes pertinent performance information and assessments of availability, natural resource requirements, and environmental impacts for the base case. Estimates of capital costs, operating and maintenance costs, and cost of electricity for the base case are presented in Section 5. Assessments of the impacts of more stringent sulfur removal requirements and using low-sulfur coal as fuel are presented in Section 6. The technical report prepared by Westinghouse for the gasification battery is included as Appendix A. Appendix B is an equipment list for all major plant systems outside the gasification battery. The design and cost estimate classifications chart referenced in Section 5 is included as Appendix C. 8 references, 37 figures, 29 tables.« less