skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Standpipe-Bubbler pump level control study: 1E-3862, controlled clearance pump/system model analysis (Task A) W. P. 7373. Engineering memorandum 0190. [LMFBR]

Abstract

Computer simulation results of the Standpipe-Bubbler pump level control system/controlled clearance pump configuration 1E-3862 are presented. Fluid level control system behavior is presented in graphical form for normal plant loading, unloading, and trip transients, under varying conditions of cover gas mass flow rate, tank impedances, temperature, and flow rates through discharge seal and bearing leakage paths. Satisfactory fluid level control can be attained for this configuration with a Standpipe-Bubbler system.

Authors:
;
Publication Date:
Research Org.:
General Electric Co., Sunnyvale, CA (USA); Borg-Warner Corp., Los Angeles, CA (USA). Byron Jackson Pump Div.
OSTI Identifier:
6371638
Report Number(s):
DOE/SF/98001-T8
ON: DE81023600
DOE Contract Number:  
AT03-76SF98001
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS; CONTROL SYSTEMS; LMFBR TYPE REACTORS; PRIMARY COOLANT CIRCUITS; PUMPS; COVER GAS; DESIGN; HYDRAULICS; LEVEL INDICATORS; LIQUID FLOW; BREEDER REACTORS; COOLING SYSTEMS; ENERGY SYSTEMS; EPITHERMAL REACTORS; FAST REACTORS; FBR TYPE REACTORS; FLUID FLOW; FLUID MECHANICS; FLUIDS; GASES; INERT ATMOSPHERE; LIQUID METAL COOLED REACTORS; MEASURING INSTRUMENTS; MECHANICS; REACTOR COMPONENTS; REACTOR COOLING SYSTEMS; REACTORS; 210500* - Power Reactors, Breeding

Citation Formats

Salant, R F, and Cook, M E. Standpipe-Bubbler pump level control study: 1E-3862, controlled clearance pump/system model analysis (Task A) W. P. 7373. Engineering memorandum 0190. [LMFBR]. United States: N. p., 1976. Web. doi:10.2172/6371638.
Salant, R F, & Cook, M E. Standpipe-Bubbler pump level control study: 1E-3862, controlled clearance pump/system model analysis (Task A) W. P. 7373. Engineering memorandum 0190. [LMFBR]. United States. doi:10.2172/6371638.
Salant, R F, and Cook, M E. Mon . "Standpipe-Bubbler pump level control study: 1E-3862, controlled clearance pump/system model analysis (Task A) W. P. 7373. Engineering memorandum 0190. [LMFBR]". United States. doi:10.2172/6371638. https://www.osti.gov/servlets/purl/6371638.
@article{osti_6371638,
title = {Standpipe-Bubbler pump level control study: 1E-3862, controlled clearance pump/system model analysis (Task A) W. P. 7373. Engineering memorandum 0190. [LMFBR]},
author = {Salant, R F and Cook, M E},
abstractNote = {Computer simulation results of the Standpipe-Bubbler pump level control system/controlled clearance pump configuration 1E-3862 are presented. Fluid level control system behavior is presented in graphical form for normal plant loading, unloading, and trip transients, under varying conditions of cover gas mass flow rate, tank impedances, temperature, and flow rates through discharge seal and bearing leakage paths. Satisfactory fluid level control can be attained for this configuration with a Standpipe-Bubbler system.},
doi = {10.2172/6371638},
journal = {},
number = ,
volume = ,
place = {United States},
year = {1976},
month = {6}
}