skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: C. G. Doris participation in the development of Abu-Al-Bu Koosh Field (in English and French)

Abstract

On behalf of the total-ABK group, the company, C.G. Doris, has taken an active part in the development of the gas-lift and water injection installations in the Abu-Al-Bu Koosh Fields. The gas lift platform is a 4-legged jacket in 30 m of water with 2 deck levels. It is joined by a bridge to the production platform. Total load of the new platform is 1000 tons of steel plus 200 tons of piles. The 2 water injection tripods in 41 and 27 m of water also are pile-supported jackets with the vertical and 2 inclined legs. Also, the 2 workover platforms have been thoroughly rechecked by C.G. Doris. Furthermore, a living quarters platform was designed and contracted by the company on a turn-key basis. Capacity is 60 people, with a possibility of expansion.

OSTI Identifier:
6365797
Alternate Identifier(s):
OSTI ID: 6365797
Resource Type:
Journal Article
Resource Relation:
Journal Name: Ind. Petrol. Gaz.-Chim.; Journal Volume: 49:527/528
Country of Publication:
United States
Language:
English and French
Subject:
03 NATURAL GAS; OFFSHORE PLATFORMS; CONSTRUCTION; DESIGN; OIL WELLS; GAS LIFTS; ECONOMICS; ENHANCED RECOVERY; OFFSHORE OPERATIONS; OIL FIELDS; PETROLEUM; PRODUCTION; ARTIFICIAL LIFTS; ENERGY SOURCES; FOSSIL FUELS; FUELS; GEOLOGIC DEPOSITS; MINERAL RESOURCES; PETROLEUM DEPOSITS; RECOVERY; RESOURCES; WELLS 030300* -- Natural Gas-- Drilling, Production, & Processing

Citation Formats

Not Available. C. G. Doris participation in the development of Abu-Al-Bu Koosh Field. United States: N. p., Web.
Not Available. C. G. Doris participation in the development of Abu-Al-Bu Koosh Field. United States.
Not Available. . "C. G. Doris participation in the development of Abu-Al-Bu Koosh Field". United States.
@article{osti_6365797,
title = {C. G. Doris participation in the development of Abu-Al-Bu Koosh Field},
author = {Not Available},
abstractNote = {On behalf of the total-ABK group, the company, C.G. Doris, has taken an active part in the development of the gas-lift and water injection installations in the Abu-Al-Bu Koosh Fields. The gas lift platform is a 4-legged jacket in 30 m of water with 2 deck levels. It is joined by a bridge to the production platform. Total load of the new platform is 1000 tons of steel plus 200 tons of piles. The 2 water injection tripods in 41 and 27 m of water also are pile-supported jackets with the vertical and 2 inclined legs. Also, the 2 workover platforms have been thoroughly rechecked by C.G. Doris. Furthermore, a living quarters platform was designed and contracted by the company on a turn-key basis. Capacity is 60 people, with a possibility of expansion.},
doi = {},
journal = {Ind. Petrol. Gaz.-Chim.; ()},
number = ,
volume = 49:527/528,
place = {United States},
year = {},
month = {}
}