Title: Multi-megawatt 110 GHz ECH system for the DIII-D tokamak

Abstract

Two 110 GHz gyrotrons with nominal output power of 1 MW each have been installed on the DIII-D tokamak. The first 110 GHz gyrotron built by Gycom has a nominal rating of 1 MW and a 2s pulse length, with the pulse length being determined by the maximum temperature allowed on the edge cooled boron nitride window. This gyrotron was first operated into the DIII-D tokamak in late 1996. The second gyrotron was built by Communications and Power Industries (CPI) was commissioned during the spring of 1997. The CPI gyrotron uses a double disc FC-75 cooled sapphire window which has a pulse length rating of 0.8s at 1 MW, 2s at 0.5 MW and 10s at 0.2 MW. Both gyrotrons are connected to the tokamak by a low-loss-windowless evacuated transmission line using circular corrugated waveguide for propagation in the HE(11) mode. Using short pulse lengths to avoid breakdown inside the air filled waveguide, the microwave beam has been measured inside the DIII-D vacuum vessel using a paper target and an IR camera. The resultant microwave beam was found to be well focused with a spot size of approximately 8 cm. The beam can be steered poloidially from the center tomore » the outer edge of the plasma. The initial operation of the Gycom gyrotron with about 0.5 MW delivered to a low density plasma for 0.5 s showed good central electron heating, with peak temperature in excess of 10 keV. A third gyrotron, being built by CPI, will be installed later this year. Progress with the first CPI tube will also be discussed and future plans for the ECH installation and physics experiments will be presented.« less

Authors:
; ; ; ;
Publication Date:
Research Org.:
General Atomics, San Diego, CA (United States)
Sponsoring Org.:
USDOE Office of Energy Research, Washington, DC (United States)
OSTI Identifier:
634058
Report Number(s):
GA-A22707; CONF-971065-
ON: DE98002642; TRN: 98:009745
DOE Contract Number:  
AC03-89ER51114
Resource Type:
Conference
Resource Relation:
Conference: 17. IEEE/NPSS symposium on fusion engineering, San Diego, CA (United States), 6-10 Oct 1997; Other Information: PBD: Nov 1997
Country of Publication:
United States
Language:
English
Subject:
70 PLASMA PHYSICS AND FUSION; DOUBLET-3 DEVICE; ECR HEATING; MICROWAVE AMPLIFIERS; ENERGY TRANSFER; OPERATION; RF SYSTEMS; DESIGN; POWER

Citation Formats

Callis, R W, Lohr, J, O`Neill, R C, Ponce, D, and Prater, R. Multi-megawatt 110 GHz ECH system for the DIII-D tokamak. United States: N. p., 1997. Web.
Callis, R W, Lohr, J, O`Neill, R C, Ponce, D, & Prater, R. Multi-megawatt 110 GHz ECH system for the DIII-D tokamak. United States.
Callis, R W, Lohr, J, O`Neill, R C, Ponce, D, and Prater, R. Sat . "Multi-megawatt 110 GHz ECH system for the DIII-D tokamak". United States. https://www.osti.gov/servlets/purl/634058.
@article{osti_634058,
title = {Multi-megawatt 110 GHz ECH system for the DIII-D tokamak},
author = {Callis, R W and Lohr, J and O`Neill, R C and Ponce, D and Prater, R},
abstractNote = {Two 110 GHz gyrotrons with nominal output power of 1 MW each have been installed on the DIII-D tokamak. The first 110 GHz gyrotron built by Gycom has a nominal rating of 1 MW and a 2s pulse length, with the pulse length being determined by the maximum temperature allowed on the edge cooled boron nitride window. This gyrotron was first operated into the DIII-D tokamak in late 1996. The second gyrotron was built by Communications and Power Industries (CPI) was commissioned during the spring of 1997. The CPI gyrotron uses a double disc FC-75 cooled sapphire window which has a pulse length rating of 0.8s at 1 MW, 2s at 0.5 MW and 10s at 0.2 MW. Both gyrotrons are connected to the tokamak by a low-loss-windowless evacuated transmission line using circular corrugated waveguide for propagation in the HE(11) mode. Using short pulse lengths to avoid breakdown inside the air filled waveguide, the microwave beam has been measured inside the DIII-D vacuum vessel using a paper target and an IR camera. The resultant microwave beam was found to be well focused with a spot size of approximately 8 cm. The beam can be steered poloidially from the center to the outer edge of the plasma. The initial operation of the Gycom gyrotron with about 0.5 MW delivered to a low density plasma for 0.5 s showed good central electron heating, with peak temperature in excess of 10 keV. A third gyrotron, being built by CPI, will be installed later this year. Progress with the first CPI tube will also be discussed and future plans for the ECH installation and physics experiments will be presented.},
doi = {},
journal = {},
number = ,
volume = ,
place = {United States},
year = {1997},
month = {11}
}

Conference:
Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that hold this conference proceeding.

Save / Share: