Title: Heavy oil recovery process: Conceptual engineering of a downhole methanator and preliminary estimate of facilities cost for application to North Slope Alaska

Technical Report ·
DOI:https://doi.org/10.2172/6304832· OSTI ID:6304832

Results from Tasks 8 and 9 are presented. Task 8 addressed the cost of materials and manufacturing of the Downhole Methanator and the cost of drilling and completing the vertical cased well and two horizontal drain holes in the West Sak reservoir. Task 9 addressed the preliminary design of surface facilities to support the enhanced recovery of heavy oil. Auxiliary facilities include steam reformers for carbon dioxide-rich natural gas reforming, emergency electric generators, nitrogen gas generators, and an ammonia synthesis unit. The ammonia is needed to stabilize the swelling of clays in the reservoir. Cost estimations and a description of how they were obtained are given.

Research Organization:
S-Cal Research Corp., San Rafael, CA (USA)
Sponsoring Organization:
DOE/CE
DOE Contract Number:
FG01-89CE15446
OSTI ID:
6304832
Report Number(s):
DOE/CE/15446-T4; ON: DE91004045
Country of Publication:
United States
Language:
English