skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Case history study of cogeneration facility at Southeast Missouri State University, Cape Girardeau, Missouri

Abstract

The Southeast Missouri State University total energy plant, its fuel, control, production, operation, and maintenance are examined. A financial analysis looks at comparative operating costs for central heating (case 1), stand along (case 2), and cogeneration (case 3). Finally an evaluation of the performance of the plant indicates continuation of operation with some modifications.

Publication Date:
Research Org.:
McClure (Charles J.R.) and Associates, Inc., St. Louis, MO (USA)
OSTI Identifier:
6300519
Report Number(s):
ANL/CNSV-TM-1
DOE Contract Number:
W-31-109-ENG-38
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION; 29 ENERGY PLANNING, POLICY AND ECONOMY; SCHOOL BUILDINGS; TOTAL ENERGY SYSTEMS; ECONOMICS; PERFORMANCE; CO-GENERATION; CONTROL SYSTEMS; ELECTRIC POWER; EXPERIMENTAL DATA; GRAPHS; MAINTENANCE; MISSOURI; POWER GENERATION; SPACE HEATING; STEAM GENERATION; BUILDINGS; DATA; DATA FORMS; DEUS; HEATING; INFORMATION; MIDWEST REGION; NORTH AMERICA; NUMERICAL DATA; POWER; USA; 320103* - Energy Conservation, Consumption, & Utilization- School, Municipal, & Other Public Buildings- (-1987); 290800 - Energy Planning & Policy- Heat Utilization- (1980-)

Citation Formats

Not Available. Case history study of cogeneration facility at Southeast Missouri State University, Cape Girardeau, Missouri. United States: N. p., 1977. Web. doi:10.2172/6300519.
Not Available. Case history study of cogeneration facility at Southeast Missouri State University, Cape Girardeau, Missouri. United States. doi:10.2172/6300519.
Not Available. Thu . "Case history study of cogeneration facility at Southeast Missouri State University, Cape Girardeau, Missouri". United States. doi:10.2172/6300519. https://www.osti.gov/servlets/purl/6300519.
@article{osti_6300519,
title = {Case history study of cogeneration facility at Southeast Missouri State University, Cape Girardeau, Missouri},
author = {Not Available},
abstractNote = {The Southeast Missouri State University total energy plant, its fuel, control, production, operation, and maintenance are examined. A financial analysis looks at comparative operating costs for central heating (case 1), stand along (case 2), and cogeneration (case 3). Finally an evaluation of the performance of the plant indicates continuation of operation with some modifications.},
doi = {10.2172/6300519},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Thu Sep 01 00:00:00 EDT 1977},
month = {Thu Sep 01 00:00:00 EDT 1977}
}

Technical Report:

Save / Share:
  • The Kem-Pest (Kem-Pest Laboratories) site is on the National Priorities List. The 6.1-acre site is a former pesticide formulating plant which, during operations from 1965 to 1975, channeled waste water into a two-cell lagoon. Soil contaminants (in ppb) at the site are aldrin (3,500), chlordane (30,000), dieldrin (3,800), DDD (1,500), DDT (14,000), endrin (3,700), and heptachlor (64,000). On-site ground water contaminants (in ppb) are chlordane (830), endrin (200), aldrin (170), and heptachlor (1,400). The site is considered to be of potential public health concern due to the risk caused by the possibility of human exposure to hazardous substances via groundmore » water, soils, sediments, and surface waters.« less
  • The Missouri Electric Works (MEW) site has been proposed for listing on the National Priorities List (NPL) by the U.S. Environmental Protection Agency (EPA). The facility sells, services, and remanufactures electric motors, transformers, and transformer controls. It has been in its present location since 1953. Past disposal practices have resulted in polychlorinated biphenyl (PCB) contamination of soil and sediment. Based on the available information, the site is considered to be of potential public health concern because of the risk to human health resulting from possible exposure to hazardous substances at concentrations that may result in adverse human health effects. Asmore » noted in the Human Exposure Pathways Section below, human exposure to PCBs may be occurring and may have occurred in the past via ingestion of and dermal contact with on-site soils and sediments. Recommendations are presented to restrict public access and contact with on-site soils and sediments.« less
  • The 6.4-acre Missouri Electric Works (MEW) site is an electrical equipment sales, service, and remanufacturing operation in Cape Girardeau, Missouri. Intermittent onsite runoff channels flow into Cape LaCroix Creek located 0.7 miles east of the site, which enters the Mississippi River, 1.1 miles to the southeast. The MEW property, as well as adjacent properties, have been contaminated with PCBs as the result of inadequate storage and handling of transformers and PCB-contaminated transformer oils. In addition, spills and disposal of industrial spent solvents occured onsite affecting ground water underlying site. The Record of Decision (ROD) addresses both contaminated soil and sedimentmore » removal, as well as the treatment of affected ground water. The primary contaminants of concern affecting the soil, sediment, and ground water are VOCs including benzene, PCE, and TCE; and organics including PCBs.« less
  • The Utility-University Demand-Side Management (DSM) Program Partnership at Arizona State University (ASU) was formed several years ago out of budget issues. Budgets at state universities have been tight the last few years, and some programs have been eliminated. Facilities Management, which should have significant resources to address energy issues at the university, even found itself without an engineer on staff. ASU covers over 1 sq mi and has approximately 43,000 students on campus. The state legislature mandated energy-conservation savings at the university. Without any infrastructure to implement DSM programs, the university formed groups consisting of people from Arizona Public Servicemore » Company (APS) and those on campus that had an interest in finding and implementing campus energy savings. Groups formed within the College of Engineering, among students, and with personnel from APS and the Facilities Management Center for Energy Systems Research. Because ASU is a high energy consumer, there were many opportunities to find savings. This paper describes the steps ASU has taken toward addressing a DSM plan, though not implemented yet. APS provided funding for a lighting study, and a student conducted survey resulted in the decision to relamp one classroom office building. Follow-on studies show a 41 kW drop in lighting demand as a result, in just this one building. Retrofits for other buildings are being scoped, and submitted into capital budget requests.« less
  • With funding provided by the American Recovery and Reinvestment Act (ARRA), 26 ground-source heat pump (GSHP) projects were competitively selected in 2009 to demonstrate the benefits of GSHP systems and innovative technologies for cost reduction and/or performance improvement. One of the selected demonstration projects is a district central GSHP system installed at Ball State University (BSU) in Muncie, IN. Prior to implementing the district GSHP system, 47 major buildings in BSU were served by a central steam plant with four coal-fired and three natural-gas-fired steam boilers. Cooling was provided by five water-cooled centrifugal chillers at the District Energy Station Southmore » (DESS). The new district GSHP system replaced the existing coal-fired steam boilers and conventional water-cooled chillers. It uses ground-coupled heat recovery (HR) chillers to meet the simultaneous heating and cooling demands of the campus. The actual performance of the GSHP system was analyzed based on available measured data from August 2015 through July 2016, construction drawings, maintenance records, personal communications, and construction costs. Since Phase 1 was funded in part by the ARRA grant, it is the focus of this case study. The annual energy consumption of the GSHP system was calculated based on the available measured data and other related information. It was compared with the performance of a baseline scenario— a conventional water-cooled chiller and natural-gas-fired boiler system, both of which meet the minimum energy efficiencies allowed by the American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE 90.1-2013). The comparison was made to determine source energy savings, energy cost savings, and CO2 emission reductions achieved by the GSHP system. A cost analysis was performed to evaluate the simple payback of the GSHP system. The following sections summarize the results of the analysis, the lessons learned, and recommendations for improvement in the operation of this district GSHP system.« less