Title: Insulate to pour tower foundations in winter

Abstract

If a newly poured concrete foundation for a transmission tower freezes, the concrete will not develop the compressive strength that uninterrupted curing can achieve. For this reason, construction is often deferred until winter's end. An alternative to delaying construction is to prevent freezing by insulation - the method used to hasten completion of a portion of an HVDC transmission line last winter in Minnesota.

Authors:
 [1]; ;
  1. (Gilbert/Commonwealth, Jackson, MI)
Publication Date:
OSTI Identifier:
6079338
Alternate Identifier(s):
OSTI ID: 6079338
Resource Type:
Journal Article
Journal Name:
Electr. World; (United States)
Additional Journal Information:
Journal Volume: 191:3
Country of Publication:
United States
Language:
English
Subject:
24 POWER TRANSMISSION AND DISTRIBUTION; CONCRETES; COMPRESSION STRENGTH; FREEZE PROTECTION; FOUNDATIONS; INSTALLATION; POWER TRANSMISSION TOWERS; HVDC SYSTEMS; SPECIFICATIONS; TESTING; THERMAL INSULATION; BUILDING MATERIALS; DC SYSTEMS; MATERIALS; MECHANICAL PROPERTIES; MECHANICAL STRUCTURES; POWER SYSTEMS; SUPPORTS 200301* -- Power Transmission & Distribution-- AC Systems, EHV & UHV-- (-1989); 200302 -- Power Transmission & Distribution-- DC Systems-- (1989-)

Citation Formats

Poppens, A.D., Heiser, R.J., and Nelson, J.M. Insulate to pour tower foundations in winter. United States: N. p., 1979. Web.
Poppens, A.D., Heiser, R.J., & Nelson, J.M. Insulate to pour tower foundations in winter. United States.
Poppens, A.D., Heiser, R.J., and Nelson, J.M. Thu . "Insulate to pour tower foundations in winter". United States.
@article{osti_6079338,
title = {Insulate to pour tower foundations in winter},
author = {Poppens, A.D. and Heiser, R.J. and Nelson, J.M.},
abstractNote = {If a newly poured concrete foundation for a transmission tower freezes, the concrete will not develop the compressive strength that uninterrupted curing can achieve. For this reason, construction is often deferred until winter's end. An alternative to delaying construction is to prevent freezing by insulation - the method used to hasten completion of a portion of an HVDC transmission line last winter in Minnesota.},
doi = {},
journal = {Electr. World; (United States)},
number = ,
volume = 191:3,
place = {United States},
year = {1979},
month = {2}
}