skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Present status of compact synchrotron light source ''AURORA''

Abstract

The construction program of AURORA, the compact synchrotron light source, was started in the fall of 1986, and is now at the final assembly stage. We have observed a good uniform field from the superconducting magnet. In this article the construction status of the superconducting electron storage ring, injection microtron, beam monitoring, and control system is briefly reported.

Authors:
Publication Date:
Research Org.:
Synchrotron Radiation Technology Department, Sumitomo Heavy Industries Ltd., 2-1-1 Yato-cho, Tanashi-city, Tokyo 188, Japan (JP)
OSTI Identifier:
6041827
Resource Type:
Journal Article
Journal Name:
Rev. Sci. Instrum.; (United States)
Additional Journal Information:
Journal Volume: 60:7
Country of Publication:
United States
Language:
English
Subject:
43 PARTICLE ACCELERATORS; SYNCHROTRON RADIATION SOURCES; DESIGN; BEAM INJECTION; BEAM MONITORING; CONTROL SYSTEMS; MEV RANGE 100-1000; MICROTRONS; STORAGE RINGS; SUPERCONDUCTING MAGNETS; ACCELERATORS; CYCLIC ACCELERATORS; CYCLOTRONS; ELECTRICAL EQUIPMENT; ELECTROMAGNETS; ENERGY RANGE; EQUIPMENT; MAGNETS; MEV RANGE; MONITORING; RADIATION SOURCES; SUPERCONDUCTING DEVICES; 430400* - Particle Accelerators- Storage Rings

Citation Formats

Yamada, H. Present status of compact synchrotron light source ''AURORA''. United States: N. p., 1989. Web. doi:10.1063/1.1141089.
Yamada, H. Present status of compact synchrotron light source ''AURORA''. United States. https://doi.org/10.1063/1.1141089
Yamada, H. 1989. "Present status of compact synchrotron light source ''AURORA''". United States. https://doi.org/10.1063/1.1141089.
@article{osti_6041827,
title = {Present status of compact synchrotron light source ''AURORA''},
author = {Yamada, H},
abstractNote = {The construction program of AURORA, the compact synchrotron light source, was started in the fall of 1986, and is now at the final assembly stage. We have observed a good uniform field from the superconducting magnet. In this article the construction status of the superconducting electron storage ring, injection microtron, beam monitoring, and control system is briefly reported.},
doi = {10.1063/1.1141089},
url = {https://www.osti.gov/biblio/6041827}, journal = {Rev. Sci. Instrum.; (United States)},
number = ,
volume = 60:7,
place = {United States},
year = {Sat Jul 01 00:00:00 EDT 1989},
month = {Sat Jul 01 00:00:00 EDT 1989}
}