40-kw field test power plant modification and development. Phase II. Final report, August 1980-February 1982
Phase II activities conducted between August 1980 and February 1982 on the 40-kW Engineering and Development power plant are reported. Principal activities during this period included incorporation and verification testing of improved components and subsystems for the pre-prototype field test design and establishment of installation, operation and maintenance requirements for the On-Site Field Test Program. 7321 load hours of operation were completed on the Engineering and Development Power Plant including 2781 hours of weatherized operation at an outside test site. The power plant powered in-house loads including the centralized data acquisition system, several heat pumps and a fan coil. Customer waste heat recovery was demonstrated.
- Research Organization:
- United Technologies Corp., South Windsor, CT (USA). Power Systems Div.
- OSTI ID:
- 5909378
- Report Number(s):
- PB-83-195073; FCR-4580
- Country of Publication:
- United States
- Language:
- English
Similar Records
40-kW fuel cell technology improvement program, manufacture and acceptance test of three early field test 40-kW power plants. Final report, September 29, 1980-October 14, 1983
UTILITY ADVANCED TURBINE SYSTEMS(ATS) TECHNOLOGY READINESS TESTING
Related Subjects
FUEL CELLS
FIELD TESTS
HEAT RECOVERY
INSTALLATION
MAINTENANCE
MODIFICATIONS
OPERATION
PERFORMANCE TESTING
POWER RANGE 10-100 KW
WASTE HEAT UTILIZATION
DIRECT ENERGY CONVERTERS
ELECTROCHEMICAL CELLS
ENERGY RECOVERY
RECOVERY
TESTING
WASTE PRODUCT UTILIZATION
300502* - Fuel Cells- Performance & Testing