Title: Feasibility study of the Tremont Dam Power Project, Wareham, Massachusetts. Final report

Abstract

A study was conducted to establish the feasibility of restoring hydroelectric generation facilities to the Town-owned Tremont Dam in Wareham, Massachusetts on the Weweantic River. A head of 22 +- 2 ft is developed at the site. The power generated from the normal expected mean annual stream flow would be approximately 1,000,000 kWhr annually. It was concluded that this Project should be implemented as rapidly as possible since no environmental or other barrier exists to the restoration of hydroelectric facilities at Tremont Dam, and there are significant financial benefits to the Town. In addition, there are favorable possibilities for participation as part of state and federal Demonstration programs to further the cost-effective utilization of indigenous, renewable energy resources.

Authors:
;
Publication Date:
Research Org.:
United Technologies Research Center, East Hartford, CT (USA)
OSTI Identifier:
5901673
Alternate Identifier(s):
OSTI ID: 5901673
Report Number(s):
DOE/ID/01778-1
DOE Contract Number:  
EW-78-F-07-1778
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
13 HYDRO ENERGY; LOW-HEAD HYDROELECTRIC POWER PLANTS; ECONOMICS; ENVIRONMENTAL IMPACTS; FEASIBILITY STUDIES; MASSACHUSETTS; HYDROELECTRIC POWER; DAMS; LEGAL ASPECTS; POWER GENERATION; RETROFITTING; TECHNOLOGY ASSESSMENT; ELECTRIC POWER; ENERGY SOURCES; HYDROELECTRIC POWER PLANTS; NORTH AMERICA; NORTH ATLANTIC REGION; POWER; POWER PLANTS; RENEWABLE ENERGY SOURCES; USA 130100* -- Hydro Energy-- Resources & Availability

Citation Formats

Wright, E.S., and Mankauskas, J.J. Feasibility study of the Tremont Dam Power Project, Wareham, Massachusetts. Final report. United States: N. p., 1979. Web.
Wright, E.S., & Mankauskas, J.J. Feasibility study of the Tremont Dam Power Project, Wareham, Massachusetts. Final report. United States.
Wright, E.S., and Mankauskas, J.J. Thu . "Feasibility study of the Tremont Dam Power Project, Wareham, Massachusetts. Final report". United States.
@article{osti_5901673,
title = {Feasibility study of the Tremont Dam Power Project, Wareham, Massachusetts. Final report},
author = {Wright, E.S. and Mankauskas, J.J.},
abstractNote = {A study was conducted to establish the feasibility of restoring hydroelectric generation facilities to the Town-owned Tremont Dam in Wareham, Massachusetts on the Weweantic River. A head of 22 +- 2 ft is developed at the site. The power generated from the normal expected mean annual stream flow would be approximately 1,000,000 kWhr annually. It was concluded that this Project should be implemented as rapidly as possible since no environmental or other barrier exists to the restoration of hydroelectric facilities at Tremont Dam, and there are significant financial benefits to the Town. In addition, there are favorable possibilities for participation as part of state and federal Demonstration programs to further the cost-effective utilization of indigenous, renewable energy resources.},
doi = {},
journal = {},
number = ,
volume = ,
place = {United States},
year = {1979},
month = {2}
}

Technical Report:
Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that may hold this item. Keep in mind that many technical reports are not cataloged in WorldCat.

Save / Share: