Houston area medium-Btu coal-gasification project feasibility study. Final report. Volume III. Facility and distribution system design. [Production based on using Texaco gasifiers to process Illinois No. 6 coal]
The primary objective of the Houston Study design effort was to develop technologically feasible designs for the gasification facility and product distribution system in sufficient detail for preparing a +-25% cost estimate. The design is based on a nominal production of 125 billion Btu/day of hydrogen and syngas with key support facilities designed to accommodate expansion to 250 billion Btu/day. Production is based on using Texaco gasifiers to process Illinois No. 6 coal barged to the site. A 2800-acre site located about 4 miles north of Texas City and 32 miles southeast of Houston was selected as best suited to accommodate the facility and service the defined market. In addition to environmental and socioeconomic studies, the site was evaluated for conduciveness to construction and operation. Preliminary plot plan studies indicate that only 800 to 1000 acres will be required for the facility. The facility and distribution system costs were developed based on factors associated with this site. The facility consists of 31 individual plants; thirteen comprise the basic processes for converting coal to gaseous products, and eighteen are support systems. The distribution system follows existing pipeline corridors and is designed to accommodate expansion to 250 billion Btu/day. Volume III summarizes the design effort including process selection rationale and sensitivities, and defines the design used as a basis for the cost estimate. 66 figures, 56 tables.
- Research Organization:
- Union Carbide Corp., Tonawanda, NY (USA). Linde Div.
- DOE Contract Number:
- FG01-80RA50382
- OSTI ID:
- 5767924
- Report Number(s):
- DOE/RA/50382-1449-Vol.3; ON: DE83016665
- Resource Relation:
- Other Information: Portions are illegible in microfiche products. Original copy available until stock is exhausted
- Country of Publication:
- United States
- Language:
- English
Similar Records
Coal-to-methanol: an engineering evaluation of Texaco gasification and ICI methanol-synthesis route. Final report
Houston area medium-Btu coal-gasification project feasibility study. Final report. Volume II. Commercial viability. [Texaco gasifiers used to process Illinois No. 6 coal barged to the site]
Related Subjects
COAL GASIFICATION PLANTS
DESIGN
ECONOMIC ANALYSIS
FEASIBILITY STUDIES
PIPELINES
SITE SELECTION
TEXAS
CONSTRUCTION
COST
FLOWSHEETS
HYDROGEN
INTERMEDIATE BTU GAS
PRODUCTION
SYNTHESIS GAS
DIAGRAMS
ECONOMICS
ELEMENTS
FEDERAL REGION VI
FLUIDS
FUEL GAS
FUELS
GAS FUELS
GASES
INDUSTRIAL PLANTS
NONMETALS
NORTH AMERICA
USA
010404* - Coal
Lignite
& Peat- Gasification
015000 - Coal
Lignite
& Peat- Economic
Industrial
& Business Aspects