Title: Enloe power development feasibility assessment report. Public utility district No. 1 of Okanogan County

Abstract

The feasibility of rehabilitating an existing power house at the Enloe Dam in Washington was evaluated with consideration of expected power production, social and environmental impacts, regulatory aspects, technical requirements, financing, costs, and market potential. This assessment showed that rebuilding the existing powerhouse and appurtenant facilities is technically feasible. Rebuilding the existing turbines and generators proved to be the most desirable of three alternatives considered. The following four factors lead to this conclusion: rebuilding the old equipment is less costly than installing new turbines and generators; no major structural changes to the powerhouse would be required; rebuilding the turbines with increased flow capacity made the rebuilding alternative competitive with new equipment from an energy production standpoint; and rebuilding is compatible with the Enloe site's recent addition to the National Register of Historic Places.

Publication Date:
Research Org.:
CH2M Hill, Bellevue, WA (USA)
OSTI Identifier:
5690810
Report Number(s):
DOE/ID/01791-1
DOE Contract Number:  
EW-78-F-07-1791
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
13 HYDRO ENERGY; HYDROELECTRIC POWER PLANTS; ECONOMICS; ENVIRONMENTAL EFFECTS; FEASIBILITY STUDIES; WASHINGTON; HYDROELECTRIC POWER; DESIGN; ELECTRIC POWER; FINANCING; MARKET; REGULATIONS; ENERGY SOURCES; NORTH AMERICA; PACIFIC NORTHWEST REGION; POWER; POWER PLANTS; RENEWABLE ENERGY SOURCES; USA; 130100* - Hydro Energy- Resources & Availability

Citation Formats

None. Enloe power development feasibility assessment report. Public utility district No. 1 of Okanogan County. United States: N. p., 1979. Web. doi:10.2172/5690810.
None. Enloe power development feasibility assessment report. Public utility district No. 1 of Okanogan County. United States. doi:10.2172/5690810.
None. Thu . "Enloe power development feasibility assessment report. Public utility district No. 1 of Okanogan County". United States. doi:10.2172/5690810. https://www.osti.gov/servlets/purl/5690810.
@article{osti_5690810,
title = {Enloe power development feasibility assessment report. Public utility district No. 1 of Okanogan County},
author = {None},
abstractNote = {The feasibility of rehabilitating an existing power house at the Enloe Dam in Washington was evaluated with consideration of expected power production, social and environmental impacts, regulatory aspects, technical requirements, financing, costs, and market potential. This assessment showed that rebuilding the existing powerhouse and appurtenant facilities is technically feasible. Rebuilding the existing turbines and generators proved to be the most desirable of three alternatives considered. The following four factors lead to this conclusion: rebuilding the old equipment is less costly than installing new turbines and generators; no major structural changes to the powerhouse would be required; rebuilding the turbines with increased flow capacity made the rebuilding alternative competitive with new equipment from an energy production standpoint; and rebuilding is compatible with the Enloe site's recent addition to the National Register of Historic Places.},
doi = {10.2172/5690810},
journal = {},
number = ,
volume = ,
place = {United States},
year = {1979},
month = {2}
}