Title: Utility of fuzzy cross-impact simulation in environmental assessment

Abstract

Fuzzy cross-impact simulation is a qualitative technique, where interactions within a system are represented by a cross-impact matrix that includes linguistic elements. It can be used effectively to visualize dynamic evolution of a system. The utility of the fuzzy cross-impact simulation approach is: (1) in dealing with uncertainties in environment-development systems; (2) scoping cumulative effect assessment; and (3) integrating societal response structure in environment impact assessment. Use of the method is illustrated in a case concerning the textile industry in Indore, India. Consequences of policy alternatives for cleanup and pollution abatement are predicted in terms of environmental quality and quality of life, using the simulation model. The consequence analysis is used to arrive at preferred policy options.

Authors:
 [1]; ;  [2]
  1. Government Post Graduate Narmada Coll., Hoshangabad (India)
  2. National Environmental Engineering Research Inst., Nagpur (India)
Publication Date:
OSTI Identifier:
566275
Resource Type:
Journal Article
Resource Relation:
Journal Name: Environmental Impact Assessment Review; Journal Volume: 17; Journal Issue: 6; Other Information: PBD: Nov 1997
Country of Publication:
United States
Language:
English
Subject:
29 ENERGY PLANNING AND POLICY; ENVIRONMENTAL IMPACTS; ENVIRONMENTAL QUALITY; DECISION MAKING; MATHEMATICAL MODELS; FORECASTING; POLLUTION ABATEMENT; ENVIRONMENTAL POLICY

Citation Formats

Parashar, A., Paliwal, R., and Rambabu, P. Utility of fuzzy cross-impact simulation in environmental assessment. United States: N. p., 1997. Web. doi:10.1016/S0195-9255(97)00046-2.
Parashar, A., Paliwal, R., & Rambabu, P. Utility of fuzzy cross-impact simulation in environmental assessment. United States. doi:10.1016/S0195-9255(97)00046-2.
Parashar, A., Paliwal, R., and Rambabu, P. 1997. "Utility of fuzzy cross-impact simulation in environmental assessment". United States. doi:10.1016/S0195-9255(97)00046-2.
@article{osti_566275,
title = {Utility of fuzzy cross-impact simulation in environmental assessment},
author = {Parashar, A. and Paliwal, R. and Rambabu, P.},
abstractNote = {Fuzzy cross-impact simulation is a qualitative technique, where interactions within a system are represented by a cross-impact matrix that includes linguistic elements. It can be used effectively to visualize dynamic evolution of a system. The utility of the fuzzy cross-impact simulation approach is: (1) in dealing with uncertainties in environment-development systems; (2) scoping cumulative effect assessment; and (3) integrating societal response structure in environment impact assessment. Use of the method is illustrated in a case concerning the textile industry in Indore, India. Consequences of policy alternatives for cleanup and pollution abatement are predicted in terms of environmental quality and quality of life, using the simulation model. The consequence analysis is used to arrive at preferred policy options.},
doi = {10.1016/S0195-9255(97)00046-2},
journal = {Environmental Impact Assessment Review},
number = 6,
volume = 17,
place = {United States},
year = 1997,
month =
}
  • The information related to the different environmental impacts produced by the execution of activities and projects is often limited, described by semantic variables and, affected by a high degree of inaccuracy and uncertainty, thereby making fuzzy logic a suitable tool with which to express and treat this information. The present study proposes a new approach based on fuzzy logic to carry out the environmental impact assessment (EIA) of these activities and projects. Firstly, a set of impact properties is stated and two nondimensional parameters - ranging from 0 to 100 -are assigned, (p{sub i}) to assess the value of themore » property and (v{sub i}) to assess its contribution to each environmental impact. Next, the impact properties are described by means of fuzzy numbers p{sub i}{sup -} using generalised confidence intervals. Then, a procedure based on fuzzy arithmetic is developed to define the assessment functions v-bar = f(p-bar) - conventional mathematical functions, which incorporate the knowledge of these impact properties and give the fuzzy values v{sub i}{sup -} corresponding to each p{sub i}{sup -}. Subsequently, the fuzzy value of each environmental impact V-bar is estimated by aggregation of the values v{sub i}{sup -}, in order to obtain the total positive and negative environmental impacts V{sup +-} and V{sup --} and, later - from them - the total environmental impact of the activity or project TV{sup -}. Finally, the defuzzyfication of TV{sup -} leads to a punctual impact estimator TV{sup (1)} - a conventional EI estimation - and its corresponding uncertainty interval estimator left brace(delta{sub l}(TV{sup -}),delta{sub r}(TV{sup -})right brace, which represent the total value of the environmental impact caused by the execution of the considered activity or project.« less
  • This study shows the practical application of the EIA method based on fuzzy logic proposed by the authors (Peche and Rodriguez, 2009) to a simplified case of study-the activity of a petrol station throughout its exploitation. The intensity (p{sub 1}), the extent (p{sub 2}) and the persistence (p{sub 3}) were the properties selected to describe the impacts and their respective assessment functions v-bar{sub i}=f(p-bar{sub i}) were determined. The main actions (A) and potentially affected environmental factors (F) were selected. Every impact was identified by a pair A-F and the values of the three impact properties were estimated for each ofmore » them by means of triangular fuzzy numbers. Subsequently, the fuzzy estimation of every impact was carried out, the estimation of the impact A{sub 1}-F{sub 2} (V-bar{sub 1}) being explained in detail. Every impact was simultaneously represented by its corresponding generalised confidence interval and membership function. Since the membership functions of all impacts were similar to triangular fuzzy numbers, a triangular approach (TA) was used to describe every impact. A triangular approach coefficient (TAC) was introduced to quantify the similarity of each fuzzy number and its corresponding triangular approach, where TAC (V-bar) element of (0, 1] and TAC being 1 when the fuzzy number is triangular. The TACs-ranging from 0.96 to 0.99-proved that TAs were valid in all cases. Next, the total positive and negative impacts-TV-bar{sup +} and TV-bar{sup -} were calculated and later, the fuzzy value of the total environmental impact TV-bar was determined from them. Finally, the defuzzification of TV-bar led to the punctual impact estimator TV{sup (1)} = -88.50 and its corresponding uncertainty interval [{delta}{sub l}(TV-bar),{delta}{sub r}(TV-bar)]=[6.52,6.96], which represent the total value of the EI. In conclusion, the EIA method enabled the integration of heterogeneous impacts, which exerted influence on environmental factors of a very diverse nature in very different ways, into a global impact indicator.« less
  • The current trend of industrialization and urbanization in developing nations has a huge impact on anthropogenic and natural ecosystems. Pollution sources increase with the expansion of cities and cause contamination of water, air and soil. The absence of urban environmental planning and management strategies has resulted in greater concern for future urban development. This paper advocates the adoption of strategic environmental assessment (SEA) as a means to achieve sustainable development in developing countries. It investigates project-level environmental impact assessment (EIA) and its limitations. The exploration of SEA and its features are addressed. The effective implementation of SEA can create amore » roadmap for sustainable development. In many developing countries, the lack of transparency and accountability and ineffective public participation in the development of the policy, plan and program (PPP) would be mitigated by the SEA process. Moreover, the proactive and broadly based characteristics of SEA would benefit the institutional development of the PPP process, which is rarely experienced in many developing countries. The paper also explores the prospects for SEA and its guiding principles in developing countries. Finally, the paper calls for a coordinated effort between all government, nongovernment and international organizations involved with PPPs to enable developing countries to pursue a path of sustainable development through the development and application of strategic environmental assessment.« less
  • The Environmental Impact Assessment (EIA) and Strategic Environmental Assessment (SEA) are procedural tools which have as goal to assess and evaluate possible environmental effects of, respectively, a proposed project or policy plan. The goal of this article is to explore possible bottlenecks in applying both the EIA and SEA procedures on Carbon Capture and Storage (CCS) activities in the Netherlands, as experience is currently minimal or lacking. In this study we focus mainly on the institutional and procedural aspects of the screening and scoping phases of both procedures. This is achieved by reviewing EIA and SEA procedures for analogue projectsmore » for the three distinctive process steps of a CCS project, namely the power plant with capture, the transport and finally the underground storage of the CO{sub 2}. Additionally, EIA and SEA or similar procedures on CCS in other countries are reviewed and the legal framework for the Dutch EIA and SEA is studied. This article shows a concise overview of the EIA and SEA procedure in the Netherlands and the relation between both procedures. Based on our findings we have constructed a conceptual taxonomy for the scope of both procedures for CCS in the Netherlands. This taxonomy conceptualizes the possible integration of assessing the environmental impacts for tiered levels of decision making. This integration might be needed for first CCS projects as decisions on the strategic (spatial planning) level are currently absent for CCS in the Netherlands. Perpendicular to such integration is the integration of linked activities in the CCS chain and their alternatives, into one procedure. We argue that it would be beneficial to combine the separate EIA procedures for CCS activities into one procedure or at least provide close linkage between them.« less
  • Constructing highways in dense urban areas is always a challenge. In Sao Paulo Metropolitan Region, heavy truck traffic contributes to clog streets and expressways alike. As part of the traffic neither originates nor head to the region, a peripheral highway has been proposed to reduce traffic problems. This project, called Rodoanel, is an expressway approximately 175 km long. The fact that the projected south and north sections would cross catchments that supply most of the metropolis water demand was strongly disputed and made the environmental permitting process particularly difficult. The agency in charge commissioned a strategic environmental assessment (SEA) ofmore » a revamped project, and called it the Rodoanel Programme. However, the SEA report failed to satisfactorily take account of significant strategic issues. Among these, the highway potential effect of inducing urban sprawl over water protection zones is the most critical issue, as it emerged later as a hurdle to project licensing. Conclusion is that, particularly where no agreed-upon framework for SEA exists, when vertical tiering with downstream project EIA is sought, then a careful scoping of strategic issues is more than necessary. If an agreement on 'what is strategic' is not reached and not recognized by influential stakeholders, then the unsettled conflicts will be transferred to project EIA. In such a context, SEA will have added another loop to the usually long road to project approval.« less