Shippingport Station Decommissioning Project (SSDP): configuration control system and project activity controls
Abstract
The SSDP has been using a Configuration Control system as a significant element in the management plan for the safe and effective performance of the project. The objective of the Configuration Control system is to control the physical plant configuration, system status, work schedules, status tracking, and day-to-day problem resolution. Prior to the Decommissioning Operations Contractor (DOC) assuming operational responsibility for the Shippingport Plant, an assessment was made of the status of the configuration of the systems and related documentation. Action was taken as required to match the operating procedures and system documentation with the actual physical condition of the plant. During the first stage of the project, planning was put in place for subsequent decommissioning activities. This planning included defining organizational responsibilities, completing the necessary project instructions and procedures, and doing the planning and scheduling for the subsequent decommissioning phase activities. Detailed instructions for the performance of the various decommissioning tasks were prepared. Prior to the start of any work on a given Activity Package, a Work Authorization is required. The Work Authorization form provides a complete checklist to ensure that all necessary prerequisites are completed. A computerized Communications Configuration Control Information system monitors status including information on systemmore »
- Authors:
- Publication Date:
- Research Org.:
- General Electric Co., Shippingport, PA (USA). Nuclear Energy Business Operations
- OSTI Identifier:
- 5660432
- Report Number(s):
- DOE/SSDP-0007; CONF-860724-8
ON: DE86011760; TRN: 86-020229
- DOE Contract Number:
- AC06-84RL10421; AC06-76RL01857
- Resource Type:
- Conference
- Resource Relation:
- Conference: ASME/ANS bi-annual nuclear power conference: safe and reliable nuclear power plants, Philadelphia, PA, USA, 20 Jul 1986; Other Information: Portions of this document are illegible in microfiche products
- Country of Publication:
- United States
- Language:
- English
- Subject:
- 21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS; SHIPPINGPORT REACTOR; CONTROL SYSTEMS; REACTOR DECOMMISSIONING; COST; MAINTENANCE; PERFORMANCE; PROGRAM MANAGEMENT; DECOMMISSIONING; ENRICHED URANIUM REACTORS; MANAGEMENT; POWER REACTORS; PWR TYPE REACTORS; REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS; 210200* - Power Reactors, Nonbreeding, Light-Water Moderated, Nonboiling Water Cooled; 210700 - Nuclear Power Plants- Regulation & Licensing
Citation Formats
Mullee, G R. Shippingport Station Decommissioning Project (SSDP): configuration control system and project activity controls. United States: N. p., 1986.
Web.
Mullee, G R. Shippingport Station Decommissioning Project (SSDP): configuration control system and project activity controls. United States.
Mullee, G R. 1986.
"Shippingport Station Decommissioning Project (SSDP): configuration control system and project activity controls". United States.
@article{osti_5660432,
title = {Shippingport Station Decommissioning Project (SSDP): configuration control system and project activity controls},
author = {Mullee, G R},
abstractNote = {The SSDP has been using a Configuration Control system as a significant element in the management plan for the safe and effective performance of the project. The objective of the Configuration Control system is to control the physical plant configuration, system status, work schedules, status tracking, and day-to-day problem resolution. Prior to the Decommissioning Operations Contractor (DOC) assuming operational responsibility for the Shippingport Plant, an assessment was made of the status of the configuration of the systems and related documentation. Action was taken as required to match the operating procedures and system documentation with the actual physical condition of the plant. During the first stage of the project, planning was put in place for subsequent decommissioning activities. This planning included defining organizational responsibilities, completing the necessary project instructions and procedures, and doing the planning and scheduling for the subsequent decommissioning phase activities. Detailed instructions for the performance of the various decommissioning tasks were prepared. Prior to the start of any work on a given Activity Package, a Work Authorization is required. The Work Authorization form provides a complete checklist to ensure that all necessary prerequisites are completed. A computerized Communications Configuration Control Information system monitors status including information on system status, tag-outs, radiological work permits, etc. An ongoing effort is being directed toward maintaining operating instructions and system schematics, etc. current as the Plant configuration changes. The experience with the Configuration Control System to date has been favorable.},
doi = {},
url = {https://www.osti.gov/biblio/5660432},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Wed Jan 01 00:00:00 EST 1986},
month = {Wed Jan 01 00:00:00 EST 1986}
}