Title: Human-factors engineering-control-room design review: Shoreham Nuclear Power Station. Draft audit report

Abstract

A human factors engineering preliminary design review of the Shoreham control room was performed at the site on March 30 through April 3, 1981. This design review was carried out by a team from the Human Factors Engineering Branch, Division of Human Factors Safety. This report was prepared on the basis of the HFEB's review of the applicant's Preliminary Design Assessment and the human factors engineering design review/audit performed at the site. The presented sections are numbered to conform to the guidelines of the draft version of NUREG-0700. They summarize the teams's observations of the control room design and layout, and of the control room operators' interface with the control room environment.

Authors:
; ; ;
Publication Date:
Research Org.:
SEE CODE- 9513035 California Univ., Livermore (USA). Lawrence Livermore Lab.
OSTI Identifier:
5639979
Report Number(s):
UCID-19122
ON: DE82007851; TRN: 82-010577
DOE Contract Number:
W-7405-ENG-48
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
22 GENERAL STUDIES OF NUCLEAR REACTORS; 21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS; SHOREHAM REACTOR; CONTROL ROOMS; CONSOLES; DISPLAY DEVICES; REACTOR CONTROL SYSTEMS; REACTOR OPERATORS; BWR TYPE REACTORS; CONTROL SYSTEMS; ENRICHED URANIUM REACTORS; PERSONNEL; POWER REACTORS; REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS; 220400* - Nuclear Reactor Technology- Control Systems; 210100 - Power Reactors, Nonbreeding, Light-Water Moderated, Boiling Water Cooled

Citation Formats

Peterson, L.R., Preston-Smith, J., Savage, J.W., and Rousseau, W.F. Human-factors engineering-control-room design review: Shoreham Nuclear Power Station. Draft audit report. United States: N. p., 1981. Web. doi:10.2172/5639979.
Peterson, L.R., Preston-Smith, J., Savage, J.W., & Rousseau, W.F. Human-factors engineering-control-room design review: Shoreham Nuclear Power Station. Draft audit report. United States. doi:10.2172/5639979.
Peterson, L.R., Preston-Smith, J., Savage, J.W., and Rousseau, W.F. Fri . "Human-factors engineering-control-room design review: Shoreham Nuclear Power Station. Draft audit report". United States. doi:10.2172/5639979. https://www.osti.gov/servlets/purl/5639979.
@article{osti_5639979,
title = {Human-factors engineering-control-room design review: Shoreham Nuclear Power Station. Draft audit report},
author = {Peterson, L.R. and Preston-Smith, J. and Savage, J.W. and Rousseau, W.F.},
abstractNote = {A human factors engineering preliminary design review of the Shoreham control room was performed at the site on March 30 through April 3, 1981. This design review was carried out by a team from the Human Factors Engineering Branch, Division of Human Factors Safety. This report was prepared on the basis of the HFEB's review of the applicant's Preliminary Design Assessment and the human factors engineering design review/audit performed at the site. The presented sections are numbered to conform to the guidelines of the draft version of NUREG-0700. They summarize the teams's observations of the control room design and layout, and of the control room operators' interface with the control room environment.},
doi = {10.2172/5639979},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Fri Apr 24 00:00:00 EST 1981},
month = {Fri Apr 24 00:00:00 EST 1981}
}

Technical Report:

Save / Share:
  • A human factors engineering preliminary design review of the Saint Lucie Unit 2 control room was performed at the site on August 3 through August 7, 1981. This design review was carried out by a team from the Human Factors Engineering Branch, Division of Human Factors Safety. This report was prepared on the basis of the HFEB's review of the applicant's Preliminary Design Assessment and the human factors engineering design review/audit performed at the site. The review team included human factors consultants from BioTechnology, Inc., Falls Church, Virginia, and from Lawrence Livermore National Laboratory (University of California), Livermore, California.
  • A human factors engineering preliminary design review of the Grand Gulf Unit 1 control room was performed at the site on June 8 through June 12, 1981. Observed human factor design discrepancies were given a priority rating of one to three (high, moderate, low), based on the increased potential for operator error and the possible consequences of that error. Priority rating 1 and 2 discrepancies should be corrected prior to issuance of an operating license. Priority rating 3 discrepancies should be evaluated and proposed actions reported as part of the long term design review (due one year from the issuemore » date of NUREG-0700). A list of human factors strengths observed in the Grand Gulf Unit 1 control room is given at the end of the ten major sections of this report. This list includes those features that the review team felt enhanced the operator interface with the control room. Finally, a list of those items that could not be evaluated is presented.« less
  • A human factors engineering design review/audit of the Waterford-3 control room was performed at the site on May 10 through May 13, 1982. The report was prepared on the basis of the HFEB's review of the applicant's Preliminary Human Engineering Discrepancy (PHED) report and the human factors engineering design review performed at the site. This design review was carried out by a team from the Human Factors Engineering Branch, Division of Human Factors Safety. The review team was assisted by consultants from Lawrence Livermore National Laboratory (University of California), Livermore, California.
  • A human factors engineering design review of the Palo Verde control room simulator was performed at the site on September 15 through September 17, 1981. Observed human factors design discrepancies were given priority ratings. This report summarizes the team's observations of the control room design and layout and of the control room operators' interface with the control room environment. A list of the human factors strengths observed in the Palo Verde control room simulator is given.
  • A human factors engineering design review/audit of the Byron Unit 1 control room was performed at the site on November 17 through November 19, 1981. This review was accomplished using the Unit 2 control room appropriately mocked-up to reflect design changes already committed to be incorporated in Unit 1. The report was prepared on the basis of the HFEB's audit of the applicant's Preliminary Design Assessment report and the human factors engineering design review performed at the site. This design review was carried out by a team from the Human Factors Engineering Branch, Division of Human Factors Safety. The reviewmore » team was assisted by consultants from BioTechnology, Inc. (Falls Church, Virginia), and from Lawrence Livermore National Laboratory (University of California), Livermore, California.« less