Title: Seismic evaluation of safety systems at the Savannah River reactors

Conference ·
OSTI ID:5559531
; ;  [1]; ;  [2]
  1. EQE Engineering, Inc., San Francisco, CA (United States)
  2. Westinghouse Savannah River Co., Aiken, SC (United States)

A thorough review of all safety related systems in commercial nuclear power plants was prompted by the accident at the Three Mile Island Nuclear Power Plant. As a consequence of this review, the Nuclear Regulatory Commission (NRC) focused its attention on the environmental and seismic qualification of the industry's electrical and mechanical equipment. In 1980, the NRC issued Unresolved Safety Issue (USI) A-46 to verify the seismic adequacy of the equipment required to safely shut down a plant and maintain a stable condition for 72 hours. After extensive research by the NRC, it became apparent that traditional analysis and testing methods would not be a feasible mechanism to address this USI A-46 issue. The costs associated with utilizing the standard analytical and testing qualification approaches were exorbitant and could not be justified. In addition, the only equipment available to be shake table testing which is similar to the item being qualified is typically the nuclear plant component itself. After 8 years of studies and data collection, the NRC issued its Generic Safety Evaluation Report'' approving an alternate seismic qualification approach based on the use of seismic experience data. This experience-based seismic assessment approach will be the basis for evaluating each of the 70 pre-1972 commercial nuclear power units in the United States and for an undetermined number of nuclear plants located in foreign countries. This same cost-effective developed for the commercial nuclear power industry is currently being applied to the Savannah River Production Reactors to address similar seismic adequacy issues. This paper documents the results of the Savannah River Plant seismic evaluating program. This effort marks the first complete (non-trial) application of this state-of-the-art USI A-46 resolution methodology.

Research Organization:
Westinghouse Savannah River Co., Aiken, SC (United States)
Sponsoring Organization:
USDOE; USDOE, Washington, DC (United States)
DOE Contract Number:
AC09-89SR18035
OSTI ID:
5559531
Report Number(s):
WSRC-RP-89-868; CONF-8910192-19; ON: DE92009771
Resource Relation:
Conference: 2. DOE natural phenomena hazards mitigation conference, Knoxville, TN (United States), 3-5 Oct 1989
Country of Publication:
United States
Language:
English