skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: The HART I augmented electric gun facility

Conference · · IEEE Transactions on Magnetics (Institute of Electrical and Electronics Engineers); (United States)
OSTI ID:5523399
; ; ; ; ;  [1]
  1. Westinghouse Science and Technology Center, Pittsburgh, PA (US)

This paper reports on an augmented electric gun system that has been commissioned. This system, called HART I (Hypervelocity Augmented Railgun Test), is built around a double augmented rail arrangement with a 1.27-cm square bore. It is powered by the SUVAC II 5.6-MJ distributed capacitor power supply. This arrangement allows operation in a simple, series augmented, or transaugmented gun system configuration. The objective of this facility is to perform materials research augmentation studies, and armature development in the 10-km/s regime. Armature masses of 2 to 4 g will be accelerated in a 4-m long barrel. Baseline bore materials will begin with conventional G9/GlidCop systems and then move into pyrolytic boron nitride/refractory materials. Hybrids, plasma, and ablation stabilized armature systems are planned. The gun system is instrumented with plasma and rail B-dot probes for inbore velocity measurements. In addition, breech and muzzle voltages, currents, and external velocities are measured. The HART I system is currently performing hypervelocity experiments to verify the augmentation models.

OSTI ID:
5523399
Report Number(s):
CONF-9004136-; CODEN: IEMGA
Journal Information:
IEEE Transactions on Magnetics (Institute of Electrical and Electronics Engineers); (United States), Vol. 27:1; Conference: 5. IEEE symposium on electromagnetic launcher technology, Destin, FL (United States), 1-5 Apr 1990; ISSN 0018-9464
Country of Publication:
United States
Language:
English