skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Preliminary hydrologic testing results: McCoy Canyon flow-top, DC-7, 3410. 2-3477. 6 feet and DC-8: 3407. 0-3480. 4 feet

Technical Report ·
OSTI ID:5461687

This report describes the hydrologic tests performed for an interflow zone within the Grande Ronde Basalt at Boreholes DC-7/8. The results, along with hydrologic data from several boreholes, will provide input for hydrologic modeling of groundwater flow and solute transport to assess the feasibility of siting a nuclear waste repository beneath the Hanford Site. 7 figs., 1 tab.

Research Organization:
Rockwell International Corp., Richland, WA (USA). Rockwell Hanford Operations
Sponsoring Organization:
DOE/RW
DOE Contract Number:
AC06-77RL01030
OSTI ID:
5461687
Report Number(s):
DOE/RL/01030-T9; ON: TI90003482; TRN: 90-001216
Country of Publication:
United States
Language:
English