The NPOC Strategic Plan for Building New Nuclear Plants'' creates a framework within which new standardized nuclear plants may be built. The Strategic Plan is an expression of the nuclear energy industry's serious intent to create the necessary conditions for new plant construction and operation. One of the key elements of the Strategic Plan is a comprehensive industry commitment to standardization: through design certification, combined license, first-of-a-kind engineering, construction, operation and maintenance of nuclear power plants. The NPOC plan proposes four stages of standardization in advanced light water reactors (ALWRs). The first stage is established by the ALWR Utility Requirements Document which specifies owner/operator requirements at a functional level covering all elements of plant design and construction, and many aspects of operations and maintenance. The second stage of standardization is that achieved in the NRC design certification. This certification level includes requirements, design criteria and bases, functional descriptions and performance requirements for systems to assure plant safety. The third stage of standardization, commercial standardization, carries the design to a level of completion beyond that required for design certification to enable the industry to achieve potential increases in efficiency and economy. The final stage of standardization is enhanced standardization beyond design. A standardized approach is being developed in construction practices, operating, maintenance training, and procurement practices. This comprehensive standardization program enables the NRC to proceed with design certification with the confidence that standardization beyond the regulations will be achieved. This confidence should answer the question of design detail required for design certification, and demonstrate that the NRC should require no further regulatory review beyond that required by 10 CFR Part 52.

Research Organization:
Nuclear Power Oversight Committee (United States)
OSTI ID:
5422077
Report Number(s):
NPOC-91017052; ON: TI91017052
Country of Publication:
United States
Language:
English