Title: Designer BHAs reduce costs on Andrew/Cyrus

Journal Article · · World Oil
OSTI ID:538262

A key mechanism to development of Andrew/Cyrus has been the development of alliances between BP Exploration, its field partners and various contractors. One such joint venture was the well engineering alliance between BP, Schlumberger, Baker Hughes INTEQ and Transocean, created to deliver five predrilled horizontal wells in the two fields prior to Andrew platform installation. This alliance provided the opportunity to radically change usual ways of doing business in the well engineering arena. One specific aspect involved a rigorous learning process within the team. Rapid learning before and during the operation led to several substantial improvements, one of which was the development of designer bottomhole assembly (BHA) configurations. Continual development of these assemblies has optimized well placement, bringing enhanced value while reducing costs and increasing potential alliance gainshare.

OSTI ID:
538262
Journal Information:
World Oil, Vol. 218, Issue 10; Other Information: PBD: Oct 1997
Country of Publication:
United States
Language:
English