Title: Spent fuel storage requirements. [To year 2000 AD]

Abstract

Spent fuel storage requirements, as projected through the year 2000 for U.S. LWRs, were calculated using information supplied by the utilities reflecting plant status as of December 31, 1981. Projections through the year 2000 combined fuel discharge projections of the utilities with the assumed discharges of typical reactors required to meet the nuclear capacity of 165 GWe projected by the Energy Information Administration (EIA) for the year 2000. Three cases were developed and are summarized. A reference case, or maximum at-reactor (AR) capacity case, assumes that all reactor storage pools are increased to their maximum capacities as estimated by the utilities for spent fuel storage utilizing currently licensed technologies. The reference case assumes no transshipments between pools except as currently licensed by the Nuclear Regulatory Commission (NRC). This case identifies an initial requirement for 13 MTU of additional storage in 1984, and a cumulative requirement for 14,490 MTU additional storage in the year 2000. The reference case is bounded by two alternative cases. One, a current capacity case, assumes that only those pool storage capacity increases currently planned by the operating utilities will occur. The second, or maximum capacity with transshipment case, assumes maximum development of pool storage capacity asmore » described above and also assumes no constraints on transshipment of spent fuel among pools of reactors of like type (BWR, PWR) within a given utility. In all cases, a full core discharge capability (full core reserve or FCR) is assumed to be maintained for each reactor, except that only one FCR is maintained when two reactors share a common pool. For the current AR capacity case the indicated storage requirements in the year 2000 are indicated to be 18,190 MTU; for the maximum capacity with transshipment case they are 11,320 MTU.« less

Authors:
Publication Date:
Research Org.:
Department of Energy, Richland, WA (USA). Richland Operations Office
OSTI Identifier:
5362129
Report Number(s):
DOE/RL-82-1
ON: DE82019411
DOE Contract Number:  
AC06-76RL01830
Resource Type:
Technical Report
Resource Relation:
Other Information: Portions of document are illegible
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; SPENT FUEL STORAGE; FORECASTING; STORAGE FACILITIES; CAPACITY; AWAY-FROM-REACTOR STORAGE; CALCULATION METHODS; FUEL POOLS; NUCLEAR POWER PLANTS; RADIOACTIVE WASTE STORAGE; VOLUME; MANAGEMENT; NUCLEAR FACILITIES; POWER PLANTS; STORAGE; THERMAL POWER PLANTS; WASTE MANAGEMENT; WASTE STORAGE; 052002* - Nuclear Fuels- Waste Disposal & Storage

Citation Formats

Fletcher, J. Spent fuel storage requirements. [To year 2000 AD]. United States: N. p., 1982. Web.
Fletcher, J. Spent fuel storage requirements. [To year 2000 AD]. United States.
Fletcher, J. 1982. "Spent fuel storage requirements. [To year 2000 AD]". United States.
@article{osti_5362129,
title = {Spent fuel storage requirements. [To year 2000 AD]},
author = {Fletcher, J},
abstractNote = {Spent fuel storage requirements, as projected through the year 2000 for U.S. LWRs, were calculated using information supplied by the utilities reflecting plant status as of December 31, 1981. Projections through the year 2000 combined fuel discharge projections of the utilities with the assumed discharges of typical reactors required to meet the nuclear capacity of 165 GWe projected by the Energy Information Administration (EIA) for the year 2000. Three cases were developed and are summarized. A reference case, or maximum at-reactor (AR) capacity case, assumes that all reactor storage pools are increased to their maximum capacities as estimated by the utilities for spent fuel storage utilizing currently licensed technologies. The reference case assumes no transshipments between pools except as currently licensed by the Nuclear Regulatory Commission (NRC). This case identifies an initial requirement for 13 MTU of additional storage in 1984, and a cumulative requirement for 14,490 MTU additional storage in the year 2000. The reference case is bounded by two alternative cases. One, a current capacity case, assumes that only those pool storage capacity increases currently planned by the operating utilities will occur. The second, or maximum capacity with transshipment case, assumes maximum development of pool storage capacity as described above and also assumes no constraints on transshipment of spent fuel among pools of reactors of like type (BWR, PWR) within a given utility. In all cases, a full core discharge capability (full core reserve or FCR) is assumed to be maintained for each reactor, except that only one FCR is maintained when two reactors share a common pool. For the current AR capacity case the indicated storage requirements in the year 2000 are indicated to be 18,190 MTU; for the maximum capacity with transshipment case they are 11,320 MTU.},
doi = {},
url = {https://www.osti.gov/biblio/5362129}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Tue Jun 01 00:00:00 EDT 1982},
month = {Tue Jun 01 00:00:00 EDT 1982}
}

Technical Report:
Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that may hold this item. Keep in mind that many technical reports are not cataloged in WorldCat.

Save / Share: