Title: Synthesis gas demonstration plant program, Phase I. Deliverable No. 7F: Phases II and III environmental monitoring plans

Abstract

The baseline monitoring program established existing conditions at the site from which construction and operational impacts were predicted in the Environmental Report. The purpose of construction and operational programs is to identify and quantify impacts and monitor the effectiveness of selected mitigation measures. The construction and operational programs are a refinement of the baseline monitoring program. The goal is to avoid redundance by monitoring specific activities and areas where impacts could occcur. This includes utilizing data required for permit compliance (air and water discharges and solid waste disposal). A review of the baseline monitoring program was also conducted to determine if data gaps or voids existed in the baseline program which could be filled with a preconstruction monitoring program. The review was conducted in light of the potential impacts from construction and operational activities identified in the Environmental Report. Review of the baseline monitoring program and the Environmental Report indicated the need for some additional data. Therefore, a preconstruction monitoring program has been designed to fill in the data gaps and strengthen the data base for subsequent impact and mitigative measure assessments.

Publication Date:
Research Org.:
Grace (W.R.) and Co., Memphis, TN (USA)
OSTI Identifier:
5359289
Report Number(s):
DOE/ET/13402-T9
DOE Contract Number:  
AC02-77ET13402
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
01 COAL, LIGNITE, AND PEAT; COAL GASIFICATION; DEMONSTRATION PLANTS; ENVIRONMENTAL EFFECTS; AIR QUALITY; AQUATIC ECOSYSTEMS; BASELINE ECOLOGY; GEOLOGY; HYDROLOGY; MONITORING; NOISE; SOCIO-ECONOMIC FACTORS; SYNTHESIS GAS; TEXACO GASIFICATION PROCESS; ECOLOGY; ECOSYSTEMS; ENVIRONMENTAL QUALITY; FLUIDS; GASES; GASIFICATION; INSTITUTIONAL FACTORS; THERMOCHEMICAL PROCESSES; 010404* - Coal, Lignite, & Peat- Gasification; 010900 - Coal, Lignite, & Peat- Environmental Aspects

Citation Formats

. Synthesis gas demonstration plant program, Phase I. Deliverable No. 7F: Phases II and III environmental monitoring plans. United States: N. p., 1980. Web. doi:10.2172/5359289.
. Synthesis gas demonstration plant program, Phase I. Deliverable No. 7F: Phases II and III environmental monitoring plans. United States. doi:10.2172/5359289.
. Tue . "Synthesis gas demonstration plant program, Phase I. Deliverable No. 7F: Phases II and III environmental monitoring plans". United States. doi:10.2172/5359289. https://www.osti.gov/servlets/purl/5359289.
@article{osti_5359289,
title = {Synthesis gas demonstration plant program, Phase I. Deliverable No. 7F: Phases II and III environmental monitoring plans},
author = {},
abstractNote = {The baseline monitoring program established existing conditions at the site from which construction and operational impacts were predicted in the Environmental Report. The purpose of construction and operational programs is to identify and quantify impacts and monitor the effectiveness of selected mitigation measures. The construction and operational programs are a refinement of the baseline monitoring program. The goal is to avoid redundance by monitoring specific activities and areas where impacts could occcur. This includes utilizing data required for permit compliance (air and water discharges and solid waste disposal). A review of the baseline monitoring program was also conducted to determine if data gaps or voids existed in the baseline program which could be filled with a preconstruction monitoring program. The review was conducted in light of the potential impacts from construction and operational activities identified in the Environmental Report. Review of the baseline monitoring program and the Environmental Report indicated the need for some additional data. Therefore, a preconstruction monitoring program has been designed to fill in the data gaps and strengthen the data base for subsequent impact and mitigative measure assessments.},
doi = {10.2172/5359289},
journal = {},
number = ,
volume = ,
place = {United States},
year = {1980},
month = {1}
}