Title: Evaluation, design, development, and delivery of a 1200-kV prototype termination. Eleventh technical progress report, June 1, 1981-February 28, 1982

Abstract

Final results and conclusions are reported on the Mechanical Model Studies. Bend strength of reinforced epoxy bars before and after thermal cycling is compared. Tooling for the cast epoxy insulators was designed and component parts and tooling for the full-scale prototype were ordered.

Authors:
;
Publication Date:
Research Org.:
Westinghouse Electric Corp., Trafford, PA (USA). Power Circuit Breaker Div.
OSTI Identifier:
5278919
Report Number(s):
DOE/ET/29068-T7
ON: DE82014097
DOE Contract Number:
AC01-78ET29068
Resource Type:
Technical Report
Resource Relation:
Other Information: Portions of document are illegible
Country of Publication:
United States
Language:
English
Subject:
24 POWER TRANSMISSION AND DISTRIBUTION; POTHEADS; DESIGN; FABRICATION; UHV AC SYSTEMS; GAS-INSULATED SUBSTATIONS; ELECTRICAL INSULATION; EPOXIDES; EXPERIMENTAL DATA; FIBERGLASS; MATERIALS TESTING; MECHANICAL PROPERTIES; RESEARCH PROGRAMS; SULFUR FLUORIDES; AC SYSTEMS; DATA; ELECTRICAL EQUIPMENT; ENERGY SYSTEMS; EQUIPMENT; FLUORIDES; FLUORINE COMPOUNDS; HALIDES; HALOGEN COMPOUNDS; INFORMATION; NUMERICAL DATA; ORGANIC COMPOUNDS; ORGANIC OXYGEN COMPOUNDS; POWER SUBSTATIONS; POWER SYSTEMS; SULFUR COMPOUNDS; TESTING; 200301* - Power Transmission & Distribution- AC Systems, EHV & UHV- (-1989)

Citation Formats

Billings, J S, and Meyer, J R. Evaluation, design, development, and delivery of a 1200-kV prototype termination. Eleventh technical progress report, June 1, 1981-February 28, 1982. United States: N. p., 1982. Web. doi:10.2172/5278919.
Billings, J S, & Meyer, J R. Evaluation, design, development, and delivery of a 1200-kV prototype termination. Eleventh technical progress report, June 1, 1981-February 28, 1982. United States. doi:10.2172/5278919.
Billings, J S, and Meyer, J R. Fri . "Evaluation, design, development, and delivery of a 1200-kV prototype termination. Eleventh technical progress report, June 1, 1981-February 28, 1982". United States. doi:10.2172/5278919. https://www.osti.gov/servlets/purl/5278919.
@article{osti_5278919,
title = {Evaluation, design, development, and delivery of a 1200-kV prototype termination. Eleventh technical progress report, June 1, 1981-February 28, 1982},
author = {Billings, J S and Meyer, J R},
abstractNote = {Final results and conclusions are reported on the Mechanical Model Studies. Bend strength of reinforced epoxy bars before and after thermal cycling is compared. Tooling for the cast epoxy insulators was designed and component parts and tooling for the full-scale prototype were ordered.},
doi = {10.2172/5278919},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Fri Apr 30 00:00:00 EDT 1982},
month = {Fri Apr 30 00:00:00 EDT 1982}
}

Technical Report:

Save / Share: