Completion systems for large diameter casing
Conference
·
OSTI ID:5277557
- Baker Sand Control (US)
Completion operations, for oil and gas wells, are usually performed in casing sizes not exceeding 13-3/8 in. (34.0 cm) with the majority of completions being performed in 9-5/8 in. (24.5 cm) and smaller. As such, the availability of completion equipment, for large diameter casings, becomes extremely limited or nonexistent. Occasionally, conditions may exist which require the completion to be designed in a casing size larger than 13-3/8 in. (34.0 cm). In order to complete in these casing sizes, special equipment must be designed. This paper discusses the design criteria, development, and subsequent use of perforating and gravel pack equipment generated for use in 20 in. (50.8 cm) casing.
- OSTI ID:
- 5277557
- Report Number(s):
- CONF-8802143-
- Resource Relation:
- Conference: 7. SPE offshore South East Asia conference and exhibition, Singapore (Singapore), 2-5 Feb 1988; Other Information: Technical Paper SPE17668
- Country of Publication:
- United States
- Language:
- English
Similar Records
Drilling of a 2000 m (6562 ft) borehole for geothermal steam in Iceland
Alba field cased hole horizontal gravel pack -- a team approach to design
Alba Field cased hole horizontal gravel pack -- A team approach to design
Conference
·
Thu Jan 01 00:00:00 EST 1981
·
OSTI ID:5277557
Alba field cased hole horizontal gravel pack -- a team approach to design
Conference
·
Sun Dec 31 00:00:00 EST 1995
·
OSTI ID:5277557
Alba Field cased hole horizontal gravel pack -- A team approach to design
Conference
·
Sun Dec 31 00:00:00 EST 1995
·
OSTI ID:5277557