skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Summary of major electric utilities revised demand forecasts and resource plans

Technical Report ·
OSTI ID:5264618

This summary compares revised data with corresponding data submitted in 1978 under the Common Forecasting Methodology-II (CEM-II) by four California utilities - Southern California Edison; Los Angeles Department of Water and Power San Diego Gas and Electric; and Pacific Gas and Electric. Table 1 is a statewide summary of the updated forecasted peak demand compared to the CEM II forecast for the four utilities. Also shown on Table 1 is a statewide summary of the installed capacity of the existing system plus all planned capacity additions for the period 1979 through 1991 for both CFM II and the revised resource plans. The corresponding data for each individual utility is shown in Tables 2 through 5. Each utility forecasted a lower peak demand compared to its previous CEM II forecast.

Research Organization:
California Energy Commission, Sacramento (USA)
OSTI ID:
5264618
Report Number(s):
P-300-79-005
Country of Publication:
United States
Language:
English