skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Waste Receiving and Processing Facility Module 1: Volume 1, Preliminary Design report

Abstract

The Preliminary Design Report (Title 1) for the Waste Receiving and Processing (WRAP) Module 1 provides a comprehensive narrative description of the proposed facility and process systems, the basis for each of the systems design, and the engineering assessments that were performed to support the technical basis of the Title 1 design. The primary mission of the WRAP 1 Facility is to characterize and certify contact-handled (CH) waste in 55-gallon drums for disposal. Its secondary function is to certify CH waste in Standard Waste Boxes (SWBs) for disposal. The preferred plan consist of retrieving the waste and repackaging as necessary in the Waste Receiving and Processing (WRAP) facility to certify TRU waste for shipment to the Waste Isolation Pilot Plant (WIPP) in New Mexico. WIPP is a research and development facility designed to demonstrate the safe and environmentally acceptable disposal of TRU waste from National Defense programs. Retrieved waste found to be Low-Level Waste (LLW) after examination in the WRAP facility will be disposed of on the Hanford site in the low-level waste burial ground. The Hanford Site TRU waste will be shipped to the WIPP for disposal between 1999 and 2013.

Publication Date:
Research Org.:
United Engineers and Constructors, Inc., Englewood, CO (United States). Western Operations
Sponsoring Org.:
USDOE; USDOE, Washington, DC (United States)
OSTI Identifier:
5251942
Report Number(s):
DOE/RL/11946-1-Vol.1
ON: DE92015015
DOE Contract Number:
AC06-91RL11946
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; ALPHA-BEARING WASTES; CERTIFICATION; RADIOACTIVE WASTE PROCESSING; HANFORD RESERVATION; RADIOACTIVE WASTE FACILITIES; LOW-LEVEL RADIOACTIVE WASTES; DESIGN; COST; ENGINEERING; WASTE FORMS; WASTE RETRIEVAL; MANAGEMENT; MATERIALS; NATIONAL ORGANIZATIONS; NUCLEAR FACILITIES; PROCESSING; RADIOACTIVE MATERIALS; RADIOACTIVE WASTE MANAGEMENT; RADIOACTIVE WASTES; US DOE; US ERDA; US ORGANIZATIONS; WASTE MANAGEMENT; WASTE PROCESSING; WASTES; 052001* - Nuclear Fuels- Waste Processing

Citation Formats

Not Available. Waste Receiving and Processing Facility Module 1: Volume 1, Preliminary Design report. United States: N. p., 1992. Web.
Not Available. Waste Receiving and Processing Facility Module 1: Volume 1, Preliminary Design report. United States.
Not Available. Sun . "Waste Receiving and Processing Facility Module 1: Volume 1, Preliminary Design report". United States. doi:.
@article{osti_5251942,
title = {Waste Receiving and Processing Facility Module 1: Volume 1, Preliminary Design report},
author = {Not Available},
abstractNote = {The Preliminary Design Report (Title 1) for the Waste Receiving and Processing (WRAP) Module 1 provides a comprehensive narrative description of the proposed facility and process systems, the basis for each of the systems design, and the engineering assessments that were performed to support the technical basis of the Title 1 design. The primary mission of the WRAP 1 Facility is to characterize and certify contact-handled (CH) waste in 55-gallon drums for disposal. Its secondary function is to certify CH waste in Standard Waste Boxes (SWBs) for disposal. The preferred plan consist of retrieving the waste and repackaging as necessary in the Waste Receiving and Processing (WRAP) facility to certify TRU waste for shipment to the Waste Isolation Pilot Plant (WIPP) in New Mexico. WIPP is a research and development facility designed to demonstrate the safe and environmentally acceptable disposal of TRU waste from National Defense programs. Retrieved waste found to be Low-Level Waste (LLW) after examination in the WRAP facility will be disposed of on the Hanford site in the low-level waste burial ground. The Hanford Site TRU waste will be shipped to the WIPP for disposal between 1999 and 2013.},
doi = {},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Sun Mar 01 00:00:00 EST 1992},
month = {Sun Mar 01 00:00:00 EST 1992}
}

Technical Report:
Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that may hold this item. Keep in mind that many technical reports are not cataloged in WorldCat.

Save / Share:
  • The Preliminary Design Report (Title 1) for the Waste Receiving and Processing (WRAP) Module 1 provides a comprehensive narrative description of the proposed facility and process systems, the basis for each of the systems design, and the engineering assessments that were performed to support the technical basis of the Title 1 design. The primary mission of the WRAP 1 Facility is to characterize and certify contact-handled (CH) waste in 55-gallon drums for disposal. Its secondary function is to certify CH waste in Standard Waste Boxes (SWBs) for disposal. The preferred plan consist of retrieving the waste and repackaging as necessarymore » in the Waste Receiving and Processing (WRAP) facility to certify TRU waste for shipment to the Waste Isolation Pilot Plant (WIPP) in New Mexico. WIPP is a research and development facility designed to demonstrate the safe and environmentally acceptable disposal of TRU waste from National Defense programs. Retrieved waste found to be Low-Level Waste (LLW) after examination in the WRAP facility will be disposed of on the Hanford site in the low-level waste burial ground. The Hanford Site TRU waste will be shipped to the WIPP for disposal between 1999 and 2013.« less
  • This report presents specifications related to the buildings and equipment of the wrap facility. The facility will retrieve, process, and certify transuranic, mixed, and low-level radioactive wastes for disposal. (CBS)
  • This report presents specifications related to the buildings and equipment of the wrap facility. The facility will retrieve, process, and certify transuranic, mixed, and low-level radioactive wastes for disposal. (CBS)
  • This is a Conceptual Design Report (CDR) for the Waste Receiving and Processing (WRAP) Module 2A facility at Hanford Reservation. The mission of the WRAP Module 2A facility is to receive, process, package, certify, and ship for permanent burial at the Hanford site disposal facilities those contact handled (CH) low-level radioactive mixed wastes (LLMW) that: (1) are currently in retrievable storage at the Hanford Central Waste Complex (HCWC) awaiting a treatment capability to permit permanent disposal compliant with the Land Disposal Restrictions and; (2) are forecasted to be generated over the next 30 years. The primary sources of waste tomore » be treated at WRAP Module 2A include the currently stored waste from the 183-H solar basin evaporators, secondary solids from the future Hanford site liquid effluent treatment facilities, thermal treatment facility ash, other WRAP modules, and other, miscellaneous waste from storage and onsite/offsite waste generators consisting of compactible and non-compactible solids, contaminated soils, and metals. This volume, Volume 1 provides a narrative of the project background, objective and justification. A description of the WRAP 2A mission, operations and project scope is also included. Significant project requirements such as security, health, safety, decontamination and decomissioning, maintenance, data processing, and quality are outlined. Environmental compliance issues and regulatory permits are identified, and a preliminary safety evaluation is provided.« less
  • This Project Design Criteria document for the WRAP facility at the Hanford Site is presented within a systems format. The WRAP Module 1 facility has been categorized into eight (8) engineering systems for design purposes. These systems include: receiving, shipping and storage, nondestructive assay/nondestructive examination (NDA/NDE), waste process, internal transportation, building, heating ventilation and air conditioning (HVAC), process control, and utilities. Within each system section of this document, the system-specific requirements are identified. The scope of the system is defined, the design goals are identified and the functional requirements are detailed.