Kilowatt Isotope Power System: component test report for the electric heat source assembly. 77-KIPS-108
The purpose of the acceptance testing was to demonstrate that the electrical heat source assembly (EHSA) has completed sufficient testing to satisfy the requirements set forth within the Kilowatt Isotope Power System (KIPS) Component Test Procedure (No. KIPS1020304) for the electrical heat source assembly. The results of the acceptance testing/analysis on the EHSA are presented.
- Research Organization:
- Teledyne Energy Systems, Timonium, MD (USA)
- DOE Contract Number:
- AC02-77ET33001
- OSTI ID:
- 5075678
- Report Number(s):
- DOE/ET/33001-T10
- Country of Publication:
- United States
- Language:
- English
Similar Records
Kilowatt Isotope Power System: component test report for the ground demonstration system jet condenser orifice performance. 77-KIPS-103
Kilowatt Isotope Power System: component test report for the ground demonstration system alternator stator. 78-KIPS-17
Kilowatt Isotope Power System: test report for the radiator long and short panels. 77-KIPS-112
Technical Report
·
Tue Nov 08 00:00:00 EST 1977
·
OSTI ID:5075678
Kilowatt Isotope Power System: component test report for the ground demonstration system alternator stator. 78-KIPS-17
Technical Report
·
Wed Dec 14 00:00:00 EST 1977
·
OSTI ID:5075678
Kilowatt Isotope Power System: test report for the radiator long and short panels. 77-KIPS-112
Technical Report
·
Wed Feb 01 00:00:00 EST 1978
·
OSTI ID:5075678
Related Subjects
07 ISOTOPES AND RADIATION SOURCES
42 ENGINEERING
RADIOISOTOPE HEAT SOURCES
PERFORMANCE TESTING
RANKINE CYCLE POWER SYSTEMS
SPACECRAFT POWER SUPPLIES
MOCKUP
POWER RANGE 1-10 KW
RADIOISOTOPE BATTERIES
TEST FACILITIES
DIRECT ENERGY CONVERTERS
ELECTRONIC EQUIPMENT
EQUIPMENT
HEAT SOURCES
POWER SUPPLIES
POWER SYSTEMS
STRUCTURAL MODELS
TESTING
NESDPS Office of Nuclear Energy Space and Defense Power Systems
070301* - Isotopic Power Supplies- Design & Fabrication- (-1987)
425002 - Engineering- Power Cycles- Rankine- (1980-)
42 ENGINEERING
RADIOISOTOPE HEAT SOURCES
PERFORMANCE TESTING
RANKINE CYCLE POWER SYSTEMS
SPACECRAFT POWER SUPPLIES
MOCKUP
POWER RANGE 1-10 KW
RADIOISOTOPE BATTERIES
TEST FACILITIES
DIRECT ENERGY CONVERTERS
ELECTRONIC EQUIPMENT
EQUIPMENT
HEAT SOURCES
POWER SUPPLIES
POWER SYSTEMS
STRUCTURAL MODELS
TESTING
NESDPS Office of Nuclear Energy Space and Defense Power Systems
070301* - Isotopic Power Supplies- Design & Fabrication- (-1987)
425002 - Engineering- Power Cycles- Rankine- (1980-)