Operation of a modern oil-fired power plant under today's economic conditions in a West-German utility system
Conference
·
OSTI ID:5064119
Special problems of peak-shaving duty, cycling duty, stand-by duty, system control, rates of load change, and spinning reserve are explained, with reference to the commercial operation of the Pleinting 2 unit (425 MW). 6 refs.
- OSTI ID:
- 5064119
- Report Number(s):
- CONF-791006-
- Resource Relation:
- Conference: Joint power generation conference, Charlotte, NC, USA, 7 Oct 1979; Related Information: Paper F79 833-5
- Country of Publication:
- United States
- Language:
- English
Similar Records
One hundred megawatt solar power plant under design
Measurements of irradiation of a 640 MW orimulsion-fired utility furnace under part load conditions
Measurements and Prediction of Ash Deposition in a Cyclone-Fired Boiler Operating under Variable Load Conditions
Journal Article
·
Thu Dec 07 00:00:00 EST 1978
· Public Util. Fortn.; (United States)
·
OSTI ID:5064119
Measurements of irradiation of a 640 MW orimulsion-fired utility furnace under part load conditions
Conference
·
Tue Jul 01 00:00:00 EDT 1997
·
OSTI ID:5064119
+1 more
Measurements and Prediction of Ash Deposition in a Cyclone-Fired Boiler Operating under Variable Load Conditions
Journal Article
·
Thu Nov 23 00:00:00 EST 2023
· Fluids
·
OSTI ID:5064119
+3 more
Related Subjects
20 FOSSIL-FUELED POWER PLANTS
FEDERAL REPUBLIC OF GERMANY
FOSSIL-FUEL POWER PLANTS
OPERATION
CONTROL SYSTEMS
ELECTRIC UTILITIES
LOAD ANALYSIS
POWER RANGE 100-1000 MW
EUROPE
POWER PLANTS
PUBLIC UTILITIES
THERMAL POWER PLANTS
WESTERN EUROPE
200100* - Fossil-Fueled Power Plants- Power Plants & Power Generation
FEDERAL REPUBLIC OF GERMANY
FOSSIL-FUEL POWER PLANTS
OPERATION
CONTROL SYSTEMS
ELECTRIC UTILITIES
LOAD ANALYSIS
POWER RANGE 100-1000 MW
EUROPE
POWER PLANTS
PUBLIC UTILITIES
THERMAL POWER PLANTS
WESTERN EUROPE
200100* - Fossil-Fueled Power Plants- Power Plants & Power Generation