10 MWe Solar Thermal Central Receiver Pilot Plant: solar facilities design integration. Master control system as-built drawings (RADL Item 6-5). Volume 4. SDPC. Section 1. Specification and configuration
Technical Report
·
OSTI ID:5049396
Technical specifications and configurations of the master control system of the Barstow Solar Pilot Plant are presented. (BCS)
- Research Organization:
- McDonnell Douglas Astronautics Co., Huntington Beach, CA (USA)
- DOE Contract Number:
- AC03-79SF10499
- OSTI ID:
- 5049396
- Report Number(s):
- DOE/SF/10499-T164; STMPO-254; SAN-0499-86; MDC-H-030; ON: DE86001394
- Resource Relation:
- Other Information: Portions of this document are illegible in microfiche products
- Country of Publication:
- United States
- Language:
- English
Similar Records
10 MWe Solar Thermal Central receiver Pilot Plant solar facilities design integration: master control system as-built drawings (RADL Item 6-5). Volume 4: SDPC. Section 2: CCM data bases
10 MWe Solar Thermal Central Receiver Pilot Plant: solar facilities design integration. Master control system as-built drawings (RADL Item 6-5). Volume 5: interlock logic system (ILS)
10 MWe Solar Thermal Central Receiver Pilot Plant: solar facilities design integration. Master control system as-built drawings (RADL Item 6-5). Volume 2. DARMS, SHIMMS, and RLU's
Technical Report
·
Wed Sep 01 00:00:00 EDT 1982
·
OSTI ID:5049396
10 MWe Solar Thermal Central Receiver Pilot Plant: solar facilities design integration. Master control system as-built drawings (RADL Item 6-5). Volume 5: interlock logic system (ILS)
Technical Report
·
Wed Sep 01 00:00:00 EDT 1982
·
OSTI ID:5049396
10 MWe Solar Thermal Central Receiver Pilot Plant: solar facilities design integration. Master control system as-built drawings (RADL Item 6-5). Volume 2. DARMS, SHIMMS, and RLU's
Technical Report
·
Wed Sep 01 00:00:00 EDT 1982
·
OSTI ID:5049396