Title: GAC-ANL TNS scoping studies. Volume IX. Engineering support studies: safety, regulatory considerations. Status report for FY-77, October 1, 1976--September 30, 1977

Technical Report ·
DOI:https://doi.org/10.2172/5033837· OSTI ID:5033837

The major objective of this study was to examine the safety and regulatory requirements being considered for fusion devices at this early stage of development. The study begins with a comparative evaluation of fission and fusion devices. Succeeding sections of the study present a safety assessment, regulatory considerations, and design and siting criteria for fusion devices. The study results are based entirely on a conceptual design for a Tokamak magnetically confined experimental device to demonstrate fusion ignition. Only minor emphasis is provided to discuss the upgrade version, the fusion demonstration plant.

Research Organization:
General Atomics, San Diego, CA (United States)
DOE Contract Number:
EY-76-C-03-0167-038
OSTI ID:
5033837
Report Number(s):
GA-A-14614(Vol.9); TRN: 78-008977
Country of Publication:
United States
Language:
English