HEAVY WATER MODERATED POWER REACTORS. Progress Report, July 1961
Technical Report
·
OSTI ID:4836802
At the end of July 1961, construction of the HWCTR was about 80% complete, the reactor vessel was in place, and the Hazards Evaluation Report was submitted to AEC. Satisfactory performance was exhibited in Savannah River irradiations of three thin-walled tubes of Zircaloy-clad unalloyed uranium metal; one tube reached the highest exposure yet achieved by thin-walled metal elements. Further buckling measurements were made on clusters of 0.5-inchdiameter rods of natural uranium oxide in D/sub 2/O moderator. Addition data were obtained on heat transfer burnout with elements in subcooled water at pressures as high as 1000 psia. (auth)
- Research Organization:
- Du Pont de Nemours (E.I.) & Co. Atomic Energy Div., Wilmington, Del.
- DOE Contract Number:
- AT(07-2)-1
- NSA Number:
- NSA-15-031860
- OSTI ID:
- 4836802
- Report Number(s):
- DP-645
- Resource Relation:
- Other Information: Orig. Receipt Date: 31-DEC-61
- Country of Publication:
- United States
- Language:
- English
Similar Records
HEAVY WATER MODERATED POWER REACTORS. Progress Report, August 1961
HEAVY WATER MODERATED POWER REACTORS. Progress Report, December 1961
HEAVY WATER MODERATED POWER REACTORS PROGRESS REPORT, NOVEMBER 1961
Technical Report
·
Sun Oct 01 00:00:00 EDT 1961
·
OSTI ID:4836802
HEAVY WATER MODERATED POWER REACTORS. Progress Report, December 1961
Technical Report
·
Mon Jan 01 00:00:00 EST 1962
·
OSTI ID:4836802
HEAVY WATER MODERATED POWER REACTORS PROGRESS REPORT, NOVEMBER 1961
Technical Report
·
Fri Dec 01 00:00:00 EST 1961
·
OSTI ID:4836802