PROJECT PLUTO CONTROL SYSTEM DEVELOPMENTS AND TEST RESULTS
Abstract
Tory Il-A, the first experimental reactor in the Pluto nuclear ramjet missile program, was successfully tested. The methods of control which are employed on Tory II-A are summarized and unclassified test results pertaining to the major control systems are presented. Recent control system developments for Tory II-C, a flight-type ramjet reactor, are also described. The Tory II-C application requires 40-inch, linear-stroke servo actuators capable of operating in a high radiation environment throughout the temperature range of 70 to 1200 deg F. The problem areas and recent advances in the development of high- performance electropneumatic control systems for this application are discussed. The major control problems confronting the Pluto program are outlined and the further development efforts required are indicated. (auth)
- Authors:
- Publication Date:
- Research Org.:
- California. Univ., Livermore. Lawrence Radiation Lab.
- Sponsoring Org.:
- US Atomic Energy Commission (AEC)
- OSTI Identifier:
- 4829009
- Report Number(s):
- UCRL-6590
- NSA Number:
- NSA-16-002743
- DOE Contract Number:
- W-7405-ENG-48
- Resource Type:
- Technical Report
- Resource Relation:
- Other Information: Paper to be presented at the American Rocket Society Space Flight Report to the Nation, October 1961. Orig. Receipt Date: 31-DEC-62
- Country of Publication:
- United States
- Language:
- English
- Subject:
- REACTOR TECHNOLOGY; CIRCUITS; CONTROL SYSTEMS; ELECTRONIC EQUIPMENT; FABRICATION; FAILURES; HIGH TEMPERATURE; LOW TEMPERATURE; MACHINE PARTS; MATERIALS TESTING; PLANNING; PLUTO; PNEUMATICS; POWER PLANTS; PROPULSION; RADIATION EFFECTS; REMOTE CONTROL; RESEARCH REACTORS; ROCKETS; SERVOMECHANISMS; SIGNALS; TESTING; TORY-IIA
Citation Formats
Finnigan, R. E., and Nelson, G. G. PROJECT PLUTO CONTROL SYSTEM DEVELOPMENTS AND TEST RESULTS. United States: N. p., 1961.
Web. doi:10.2172/4829009.
Finnigan, R. E., & Nelson, G. G. PROJECT PLUTO CONTROL SYSTEM DEVELOPMENTS AND TEST RESULTS. United States. doi:10.2172/4829009.
Finnigan, R. E., and Nelson, G. G. Mon .
"PROJECT PLUTO CONTROL SYSTEM DEVELOPMENTS AND TEST RESULTS". United States.
doi:10.2172/4829009. https://www.osti.gov/servlets/purl/4829009.
@article{osti_4829009,
title = {PROJECT PLUTO CONTROL SYSTEM DEVELOPMENTS AND TEST RESULTS},
author = {Finnigan, R. E. and Nelson, G. G.},
abstractNote = {Tory Il-A, the first experimental reactor in the Pluto nuclear ramjet missile program, was successfully tested. The methods of control which are employed on Tory II-A are summarized and unclassified test results pertaining to the major control systems are presented. Recent control system developments for Tory II-C, a flight-type ramjet reactor, are also described. The Tory II-C application requires 40-inch, linear-stroke servo actuators capable of operating in a high radiation environment throughout the temperature range of 70 to 1200 deg F. The problem areas and recent advances in the development of high- performance electropneumatic control systems for this application are discussed. The major control problems confronting the Pluto program are outlined and the further development efforts required are indicated. (auth)},
doi = {10.2172/4829009},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Mon Aug 21 00:00:00 EDT 1961},
month = {Mon Aug 21 00:00:00 EDT 1961}
}
-
Midtemperature Solar Systems Test Facility (MSSTF) Project test results: Phase IVA MSSTF system operation
The results of testing the Department of Energy's Midtemperature Solar Systems Test Facility (MSSTF) at Sandia Laboratories, Albuquerque, New Mexico are summarized. The system is a dispersed power system that collects solar energy and supplies both the electrical and thermal energy demands of a representative load. Testing was done between July 1976 and March 1978. The Phase IVA MSSTF studied consists of: (1) a 200-m/sup 2/ (2160-ft/sup 2/) east--west parabolic trough collector field subsystem, which collects a measured 431-kWh thermal on a typical winter day and as estimated 483 kWh on a typical summer day; (2) a high-temperature thermocline storagemore » -
System configuration management plan for 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System
The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management. The C-M model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOE Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phasesmore » -
REACTOR POWER AND TEMPERATURE CONTROL SYSTEM. SECTION I. Test Results DL- S-128 (T-550082)
Because of the noise detected when the time settings for the damping signal computer were changed, it is recommended that the power and temperature control system be taken out of the automatic position while making a time change during actual operation. The performance of the power and temperature control system components and the circuit integrity were satisfactory. Calibration of the DELTA T and DO/PU potentiometers, elimination of noise from the damping signal computer and relay chatter, and installation of a variable resistance in the damping signal computer would improve these components. (auth)