REACTOR AUTOMATIC CONTROL AND LOAD SWING TESTS. SECTION I. Test Results DL-S-164 (T-554924)
The Reactor Power and Temperature Control System satisfactorily controlled rod movements to maintain all primary plant parameters within their individual limits during steady state operation, ramp function load changes, and a peak xenon burnout transient. The operational characteristics of the station during load swings indicate the primary system will follow the secondary system and return to a steady state conditon. The results are for three loop operation only. (auth)