Title: ARMY PWR SUPPORT AND DEVELOPMENT PROGRAM. SECOND HALF-YEAR SUMMARY REPORT, APRIL 1, 1961-SEPTEMBER 30, 1961

Abstract

Results of a study of radiation damage in SM-1 reactor vessel indicated that replacement of the vessel is possible but impractical because of health physics problems. An evaluation of PH steel components revealed that 17-4 PH steel was used for several years in control rod drives without incident. A specification for 17-4 PH procurement was developed. Data and information concerning the performance of SM-1 Core I, SM-1 Core I rearranged and spiked, SM- 1 Core H, PM-2A Core I, and SM-1A Core I, are presented. Developments on replacement cores are also reported along with results of primary system performance analysis. A study of methods for improved activity control in primary systems was continued. Resulting data from an analysis of reactor pressure vessels during operating life are included, (J.R.D.)

Publication Date:
Research Org.:
Alco Products Inc., Schenectady, N.Y.
OSTI Identifier:
4787273
Report Number(s):
APAE-108
NSA Number:
NSA-16-012728
DOE Contract Number:  
AT(30-1)-2639
Resource Type:
Technical Report
Resource Relation:
Other Information: Orig. Receipt Date: 31-DEC-62
Country of Publication:
United States
Language:
English
Subject:
REACTOR TECHNOLOGY; CONTAMINATION; CONTROL; CONTROL ELEMENTS; COOLANT LOOPS; EFFICIENCY; FABRICATION; FAILURES; HEAT TRANSFER; MACHINE PARTS; MAINTENANCE; MATERIALS TESTING; MECHANICAL PROPERTIES; MECHANICAL STRUCTURES; MONITORING; MOTORS; NEUTRON FLUX; PERFORMANCE; POWER PLANTS; PRESSURE; PRESSURE VESSELS; PWR; RADIATION EFFECTS; RADIATION PROTECTION; RADIOACTIVITY; REACTIVITY; REACTOR CORE; RODS; SERVOMECHANISMS; SM-1; SM-1A; STEELS; TEMPERATURE

Citation Formats

None. ARMY PWR SUPPORT AND DEVELOPMENT PROGRAM. SECOND HALF-YEAR SUMMARY REPORT, APRIL 1, 1961-SEPTEMBER 30, 1961. United States: N. p., 1961. Web. doi:10.2172/4787273.
None. ARMY PWR SUPPORT AND DEVELOPMENT PROGRAM. SECOND HALF-YEAR SUMMARY REPORT, APRIL 1, 1961-SEPTEMBER 30, 1961. United States. doi:10.2172/4787273.
None. Fri . "ARMY PWR SUPPORT AND DEVELOPMENT PROGRAM. SECOND HALF-YEAR SUMMARY REPORT, APRIL 1, 1961-SEPTEMBER 30, 1961". United States. doi:10.2172/4787273. https://www.osti.gov/servlets/purl/4787273.
@article{osti_4787273,
title = {ARMY PWR SUPPORT AND DEVELOPMENT PROGRAM. SECOND HALF-YEAR SUMMARY REPORT, APRIL 1, 1961-SEPTEMBER 30, 1961},
author = {None},
abstractNote = {Results of a study of radiation damage in SM-1 reactor vessel indicated that replacement of the vessel is possible but impractical because of health physics problems. An evaluation of PH steel components revealed that 17-4 PH steel was used for several years in control rod drives without incident. A specification for 17-4 PH procurement was developed. Data and information concerning the performance of SM-1 Core I, SM-1 Core I rearranged and spiked, SM- 1 Core H, PM-2A Core I, and SM-1A Core I, are presented. Developments on replacement cores are also reported along with results of primary system performance analysis. A study of methods for improved activity control in primary systems was continued. Resulting data from an analysis of reactor pressure vessels during operating life are included, (J.R.D.)},
doi = {10.2172/4787273},
journal = {},
number = ,
volume = ,
place = {United States},
year = {1961},
month = {12}
}