Title: AFBC co-firing of coal and hospital waste. Quarterly report, February - April, 1996

Abstract

The project objective is to design, construct, install provide operator training and start-up a circulating fluidized bed combustion system at the Lebanon Pennsylvania Veteran`s Affairs Medical Center. This unit will co-fire coal and hospital waste providing lower cost steam for heating and possibly cooling (absorption chiller) and operation of a steam turbine-generator for limited power generation while providing efficient destruction of both general and infectious hospital waste. The steam generated is as follows: steam = 20,000 lb/hr; temperature = 353 F (saturated); pressure = 125 psig; and steam quality = {approximately}98.5%. During this reporting period: structural corrections have been made to make the facility meet the required building costs; and refractory bakeout was successfully completed during April 23-25, 1996 over a 54 -hour period. Operating permits will be obtained after construction has been completed.

Authors:
Publication Date:
Research Org.:
USDOE Morgantown Energy Technology Center, WV (United States)
Sponsoring Org.:
USDOE Assistant Secretary for Fossil Energy, Washington, DC (United States)
OSTI Identifier:
466809
Report Number(s):
DOE/MC/27205-5331
ON: DE97051614
DOE Contract Number:
FC21-91MC27205
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: [1996]
Country of Publication:
United States
Language:
English
Subject:
01 COAL, LIGNITE, AND PEAT; 32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION; COAL; FLUIDIZED-BED COMBUSTION; COCOMBUSTION; MUNICIPAL WASTES; HOSPITALS; STEAM GENERATION PLANTS; PROGRESS REPORT; CONSTRUCTION; DESIGN

Citation Formats

Stuart, J.M. AFBC co-firing of coal and hospital waste. Quarterly report, February - April, 1996. United States: N. p., 1996. Web. doi:10.2172/466809.
Stuart, J.M. AFBC co-firing of coal and hospital waste. Quarterly report, February - April, 1996. United States. doi:10.2172/466809.
Stuart, J.M. Tue . "AFBC co-firing of coal and hospital waste. Quarterly report, February - April, 1996". United States. doi:10.2172/466809. https://www.osti.gov/servlets/purl/466809.
@article{osti_466809,
title = {AFBC co-firing of coal and hospital waste. Quarterly report, February - April, 1996},
author = {Stuart, J.M.},
abstractNote = {The project objective is to design, construct, install provide operator training and start-up a circulating fluidized bed combustion system at the Lebanon Pennsylvania Veteran`s Affairs Medical Center. This unit will co-fire coal and hospital waste providing lower cost steam for heating and possibly cooling (absorption chiller) and operation of a steam turbine-generator for limited power generation while providing efficient destruction of both general and infectious hospital waste. The steam generated is as follows: steam = 20,000 lb/hr; temperature = 353 F (saturated); pressure = 125 psig; and steam quality = {approximately}98.5%. During this reporting period: structural corrections have been made to make the facility meet the required building costs; and refractory bakeout was successfully completed during April 23-25, 1996 over a 54 -hour period. Operating permits will be obtained after construction has been completed.},
doi = {10.2172/466809},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Tue Dec 31 00:00:00 EST 1996},
month = {Tue Dec 31 00:00:00 EST 1996}
}

Technical Report:

Save / Share:
  • The project objective is to design, construct, install, provide operator training and start-up a circulating fluidized bed combustion system at the Lebanon Pennsylvania Veteran`s Affairs Medical Center. This unit will co-fire coal and hospital waste providing inexpensive and efficient destruction of both general and infectious hospital waste and steam generation. The steam generated is as follows: (1) Steam = 20,000 lb/hr, (2) Temperature = 353 F (saturated), (3) Pressure = 125 psig, and (4) Steam quality ={approximately}98.5%. On February 3, 1995 DONLEE notified Lebanon VA and DOE-METC that additional funding would be required to complete the project. This funding, inmore » the amount of $1,140,127, is needed to complete the facility, start-up and shakedown the facility, perform the test program and write the final report. On March 7, 1995 the vendors were notified that the Lebanon VA Steam Plant Project was shut down and that all work outside DONLEE was stopped pending obtaining additional funding.« less
  • The project objective is to design, construct, install, provide operator training and start-up a circulating fluidized bed combustion system at the Lebanon Pennsylvania Veteran`s Affairs Medical Center. This unit will co-fire coal and hospital waste providing lower cost steam for heating and possibly cooling (absorption chiller) and operation of a steam turbine-generator for limited power generation while providing efficient destruction of both general and infectious hospital waste. This quarterly report describes activities completed in the design, procure, install and start-up phase.
  • The project objective is to design, construct, install provide operator training and start-up a circulating fluidized bed combustion system at the Lebanon Pennsylvania Veteran`s Affairs Medical Center. This unit will co-fire coal and hospital waste providing lower cost steam for heating and possibly cooling (absorption chiller) and operation of a steam turbine-generator for limited power generation while providing efficient destruction of both general and infectious hospital waste. Operating permits will be obtained after construction has been completed. The stack sampler has been selected. This vendor is currently developing the testing protocol. Severe weather in December and January caused work delaysmore » to the project, especially to outside work The fabrication and installation of the stack are complete. Only the insulation of the stack remains to be done. Budget problems began to occur in late January. Correction of this situation should occur shortly in February or March. A current schedule for the project is included with this report.« less
  • The project objective is to design, construct, install, provide operator training and start-up a circulating fluidized bed combustion system at the Lebanon Pennsylvania Veteran`s Affairs Medical Center. This unit will co-fire coal and hospital waste providing lower cost steam for heating and possibly cooling (absorption chiller) and operation of a steam turbine-generator for limited power generation while providing efficient destruction of both general and infectious hospital waste. The steam generated as follows: (1) Steam = 20,000 lb/hr, (2) Temperature = 353 F (saturated), (3) Pressure = 125 psig, and (4) Steam quality = {approximately}98.5%.
  • The unit to be installed at Lebanon Veteran`s Affairs Medical Center will prove that circulating fluidized bed combustion can provide economically viable and efficient hospital waste destruction and steam generation. The State permitting process is proceeding. The air quality division of the Department of Environmental Resources has requested the use of anthracite coal only. Anthracite has a much lower sulfur content than bituminous coal. The use of the anthracite coal has been approved by the Department of Veteran`s Affairs. The DER permit will specify the use of antrhacite coal. The State permitting approval is expected in the near future. Testingmore » with the shredding system at the Donlee Pilot facility has been completed. The results predict the Lebanon VA facility will meet both NSPS regulations and the BAT guidelines proposed by the State of Pennsylvania. There have been no significant problems encountered to date.« less