FAIL SAFE INSTALLATION OF A VACUUM SYSTEM FOR SPUTTERING APPLICATIONS IN A GLOVE BOX.
- Authors:
- Publication Date:
- Research Org.:
- Battelle-Northwest, Richland, Wash. Pacific Northwest Lab.
- Sponsoring Org.:
- USDOE
- OSTI Identifier:
- 4159799
- Report Number(s):
- BNWL-1287
- NSA Number:
- NSA-24-022919
- DOE Contract Number:
- AT(45-1)-1830
- Resource Type:
- Technical Report
- Resource Relation:
- Other Information: UNCL. Orig. Receipt Date: 31-DEC-70
- Country of Publication:
- United States
- Language:
- English
- Subject:
- N24700* -Engineering-Radioactive Material Handling; DESIGN; FAILURES; GLOVEBOXES; RADIATION PROTECTION; REMOTE HANDLING; SAFETY; SPUTTERING; VACUUM; VACUUM SYSTEMS/design of fail safe, for glove box sputtering operations; GLOVE BOXES/vacuum system for, design of fail safe
Citation Formats
Coleman, W.J. FAIL SAFE INSTALLATION OF A VACUUM SYSTEM FOR SPUTTERING APPLICATIONS IN A GLOVE BOX.. United States: N. p., 1970.
Web. doi:10.2172/4159799.
Coleman, W.J. FAIL SAFE INSTALLATION OF A VACUUM SYSTEM FOR SPUTTERING APPLICATIONS IN A GLOVE BOX.. United States. doi:10.2172/4159799.
Coleman, W.J. Thu .
"FAIL SAFE INSTALLATION OF A VACUUM SYSTEM FOR SPUTTERING APPLICATIONS IN A GLOVE BOX.". United States.
doi:10.2172/4159799. https://www.osti.gov/servlets/purl/4159799.
@article{osti_4159799,
title = {FAIL SAFE INSTALLATION OF A VACUUM SYSTEM FOR SPUTTERING APPLICATIONS IN A GLOVE BOX.},
author = {Coleman, W.J.},
abstractNote = {},
doi = {10.2172/4159799},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Thu Jan 01 00:00:00 EST 1970},
month = {Thu Jan 01 00:00:00 EST 1970}
}
Save to My Library
You must Sign In or Create an Account in order to save documents to your library.
-
Glove box design, procurement and installation guide: Savannah River Plant
This is an information package to assist the design, procurement and installation of both shielded and unshielded glove boxes for the Savannah River Plant. The information presented includes specific proven design details, technical specifications, procurement information, design logic, cost data, safety requirements, references and installation information. All of the information contained in this guide has undergone an approval procedure that has included general acceptance by both the Engineering Department and the Savannah River Plant. Although there may be situations when this data will not apply and cannot easily be adapted, they should be considered the primary design basis and followed,more » -
Microcomputer glove box feedthrough and installation
A feedthrough mechanism for bringing data acquisition and control signals through a glove box wall is described in this paper.