PM-1 NUCLEAR POWER PLANT PROGRAM. Quarterly Progress Report No. 4 for December 1, 1959 to February 29, 1960
The objective of the contract is the design, development, fabrication, installation, and initial testing and operation of a prepackaged air- transportable pressurized water reactor nuclear power plant, the PM-I. The specified output is 1 Mw(e) and 7 million Btu/hr of heat. The plant is to be operational by March 1962. The principal efforts during the quarter were the near-completion of the final design and preparation of specifications for plant components. The entire power plant has been divided, for final design purposes, into 37 subsystems. The status of work on each subsystem at the close of the period is reported. A revised summary of design parameters is given, with flow diagrams of the primary and secondary systems. The final design work will be concluded early in the next report period. Systems development work included full-scale structural testing of a test package, preparation for a loading demonstration and testing of the air-steam condenser model. Reactor development work included: (1) Final preparations for the flexible zero-power test (PMZ-1) program. (2) Final preparations for the revised fuel element irradiation test program. (3) Continuation of reactor flow tests. One-fourth-scale model flow tests were completed and preparations for bundle flow and full-scale tests were continued. (4) Further work on the heat transfer test program, including fabrication, installation and testing of test section STTS-3, and fabrication of test sections STTS-4 and SETCH-2. (5) Final design and fabrication of the prototype magnetic jack-type control rod actuators. Work continued on study of control rod materials, with emphasis on fabrication techniques and stabilization of rare earth oxides. (For preceding period see MND-M-1814.). (auth)
- Research Organization:
- Martin Co. Nuclear Div., Baltimore, MD
- Sponsoring Organization:
- US Atomic Energy Commission (AEC)
- DOE Contract Number:
- AT(30-1)-2345
- NSA Number:
- NSA-14-023752
- OSTI ID:
- 4159522
- Report Number(s):
- MND-M-1815
- Resource Relation:
- Other Information: Orig. Receipt Date: 31-DEC-60
- Country of Publication:
- United States
- Language:
- English
Similar Records
PM-1 NUCLEAR POWER PLANT PROGRAM. Quarterly Progress Report No. 2 for June 1 to August 31, 1959
PM-1 NUCLEAR POWER PLANT PROGRAM 5TH QUARTERLY PROGRESS REPORT FOR MARCH 1, 1960 TO MAY 31, 1960
Related Subjects
AIRCRAFT
CONDENSERS
CONTROL ELEMENTS
CONTROL SYSTEMS
ENVIRONMENT
FABRICATION
FLUID FLOW
FUEL ELEMENTS
HEAT TRANSFER
HEATING
IRRADIATION
LIQUID FLOW
MACHINE PARTS
OPERATION
OXIDES
PLANNING
PM-1
POWER
POWER PLANTS
PRESSURE
RARE EARTHS
REACTOR FUELING
REACTORS
REMOTE HANDLING
RODS
STABILITY
STANDARDS
TESTING
TRANSPORT
USES
WATER COOLANT
WATER MODERATOR