PRELIMINARY DESIGN STUDY OF APPR-1B PWR-STEAM ELECTRIC STATION. VOLUME I. PRELIMINARY DESIGN STUDY OF STEAM-ELECTRIC CONVERSION SYSTEM
Abstract
A portion of the work presented in this report was performed by Bechtel Corp., San Francisco. The preliminary design of the SM-2 secondary system (power conversion equipment) is reported. Parameters, equipment, building, services, estimated cost, reliability, and a point of departure in meeting the required "quality of power" are discussed. (W.D.M.)
- Publication Date:
- Research Org.:
- Alco Products, Inc., Schenectady, N.Y.
- OSTI Identifier:
- 4153567
- Report Number(s):
- APAE-40(Vol.I)
- NSA Number:
- NSA-14-016433
- DOE Contract Number:
- DA-44-009-ENG-3506
- Resource Type:
- Technical Report
- Resource Relation:
- Other Information: A portion of the work presented in this report was performed by Bechtel Corp., San Francisco. Orig. Receipt Date: 31-DEC-60
- Country of Publication:
- United States
- Language:
- English
- Subject:
- REACTOR TECHNOLOGY; BUILDINGS; ECONOMICS; ELECTRICITY; MAINTENANCE; POWER PLANTS; PRESSURE; REACTORS; SM-1; SM-2; STEAM; TURBINES; WATER COOLANT; WATER MODERATOR
Citation Formats
. PRELIMINARY DESIGN STUDY OF APPR-1B PWR-STEAM ELECTRIC STATION. VOLUME I. PRELIMINARY DESIGN STUDY OF STEAM-ELECTRIC CONVERSION SYSTEM. United States: N. p., 1958.
Web.
. PRELIMINARY DESIGN STUDY OF APPR-1B PWR-STEAM ELECTRIC STATION. VOLUME I. PRELIMINARY DESIGN STUDY OF STEAM-ELECTRIC CONVERSION SYSTEM. United States.
. 1958.
"PRELIMINARY DESIGN STUDY OF APPR-1B PWR-STEAM ELECTRIC STATION. VOLUME I. PRELIMINARY DESIGN STUDY OF STEAM-ELECTRIC CONVERSION SYSTEM". United States.
@article{osti_4153567,
title = {PRELIMINARY DESIGN STUDY OF APPR-1B PWR-STEAM ELECTRIC STATION. VOLUME I. PRELIMINARY DESIGN STUDY OF STEAM-ELECTRIC CONVERSION SYSTEM},
author = {},
abstractNote = {A portion of the work presented in this report was performed by Bechtel Corp., San Francisco. The preliminary design of the SM-2 secondary system (power conversion equipment) is reported. Parameters, equipment, building, services, estimated cost, reliability, and a point of departure in meeting the required "quality of power" are discussed. (W.D.M.)},
doi = {},
url = {https://www.osti.gov/biblio/4153567},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Thu Dec 11 00:00:00 EST 1958},
month = {Thu Dec 11 00:00:00 EST 1958}
}
Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that may hold this item. Keep in mind that many technical reports are not cataloged in WorldCat.
Save to My Library
You must Sign In or Create an Account in order to save documents to your library.