Title: PARTICLE ACCELERATOR DIVISION SUMMARY REPORT FOR MAY 1959 THROUGH MARCH 1960

Technical Report ·
DOI:https://doi.org/10.2172/4150392· OSTI ID:4150392

The procurement status of the ring magnet power supply is given. The effects of the magnet voltage regulation method on the power requirements, the r- f accelerating voltage, and the number of accelerating gaps are summarized. Harmonics of the power supply are calculated. Correlation of synchrotron osclllation frequencies to harmonic flux densities is made. The effect of duration DELTA t of flat topping on the motor and flywheel requirements under different conditions is calculated. Arc-back expectancies with 144 and 192 rectifiers for the power supply are given. The inner and outer vacuum chambers of the ring magnet are discussed. Spacemetal will be used for the inner vacuum chamber, because of its better outgassing performance. Outgassing measurements were made on AF-31 nitrilephenolic bonding film. Theoretical studies are summarized. The radiofrequency system, injection system, ring magnet coil, and auxiliary calculations are discussed. (For preceding period see ANL-6032.) (W.D.M.)

Research Organization:
Argonne National Lab., Ill.
DOE Contract Number:
W-31-109-ENG-38
NSA Number:
NSA-14-024922
OSTI ID:
4150392
Report Number(s):
ANL-6152
Resource Relation:
Other Information: Orig. Receipt Date: 31-DEC-60