Tank waste remediation system privatization infrastructure program, configuration management implementation plan
This Configuration Management Implementation Plan (CMIP) was developed to assist in managing systems, structures, and components (SSCS), to facilitate the effective control and statusing of changes to SSCS, and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Privatization Infrastructure will take in implementing a configuration management program, to identify the Program`s products that need configuration management control, to determine the rigor of control, and to identify the mechanisms for that control.
- Research Organization:
- Fluor Daniel Hanford, Inc., Richland, WA (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States); USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 362495
- Report Number(s):
- HNF-3046; ON: DE99050926; BR: EW3130010; TRN: AHC29926%%150
- Resource Relation:
- Other Information: PBD: 18 Aug 1998
- Country of Publication:
- United States
- Language:
- English
Similar Records
Tank waste remediation system immobilized high-level waste storage project configuration management implementation plan
Tank waste remediation system privatization phase 1 infrastructure project, systems engineering implementation plan
Tank waste remediation system privatization infrastructure program requirements and document management process guide
Technical Report
·
Thu Sep 24 00:00:00 EDT 1998
·
OSTI ID:362495
Tank waste remediation system privatization phase 1 infrastructure project, systems engineering implementation plan
Technical Report
·
Wed Aug 19 00:00:00 EDT 1998
·
OSTI ID:362495
Tank waste remediation system privatization infrastructure program requirements and document management process guide
Technical Report
·
Tue May 18 00:00:00 EDT 1999
·
OSTI ID:362495