Title: Preoperational test report, vent building ventilation system

Abstract

This represents a preoperational test report for Vent Building Ventilation Systems, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system provides Heating, Ventilation, and Air Conditioning (HVAC) for the W-030 Ventilation Building. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System.

Authors:
Publication Date:
Research Org.:
Fluor Daniel Hanford Inc., Richland, WA (United States)
Sponsoring Org.:
USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
OSTI Identifier:
362372
Report Number(s):
HNF-SD-W030-TD-007
ON: DE99050340; BR: EW3130100; TRN: AHC29926%%26
DOE Contract Number:
AC06-96RL13200
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 4 Nov 1997
Country of Publication:
United States
Language:
English
Subject:
05 NUCLEAR FUELS; HANFORD RESERVATION; STORAGE FACILITIES; VENTILATION SYSTEMS; BUILDINGS; SPACE HVAC SYSTEMS; PERFORMANCE TESTING

Citation Formats

Clifton, F.T. Preoperational test report, vent building ventilation system. United States: N. p., 1997. Web. doi:10.2172/362372.
Clifton, F.T. Preoperational test report, vent building ventilation system. United States. doi:10.2172/362372.
Clifton, F.T. Tue . "Preoperational test report, vent building ventilation system". United States. doi:10.2172/362372. https://www.osti.gov/servlets/purl/362372.
@article{osti_362372,
title = {Preoperational test report, vent building ventilation system},
author = {Clifton, F.T.},
abstractNote = {This represents a preoperational test report for Vent Building Ventilation Systems, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system provides Heating, Ventilation, and Air Conditioning (HVAC) for the W-030 Ventilation Building. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System.},
doi = {10.2172/362372},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Tue Nov 04 00:00:00 EST 1997},
month = {Tue Nov 04 00:00:00 EST 1997}
}

Technical Report:

Save / Share:
  • Preoperational Test Procedure for Vent Building Ventilation System, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The Vent Building ventilation system provides ventilation, heating, cooling, and zone confinement control for the W-030 Project Vent Building. The tests verify correct System operation and correct indications displayed by the central Monitor and Control system.
  • Preoperational test report for Primary Ventilation Condensate System, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system provides a collection point for condensate generated by the W-030 primary vent offgas cooling system serving tanks AYIOI, AY102, AZIOI, AZI02. The system is located inside a shielded ventilation equipment cell and consists of a condensate seal pot, sampling features, a drain line to existing Catch Tank 241-AZ-151, and a cell sump jet pump. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System.
  • This represents the preoperational test report for the Primary Ventilation Condenser Cooling System, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system uses a closed chilled water piping loop to provide offgas effluent cooling for tanks AY101, AY102, AZ1O1, AZ102; the offgas is cooled from a nominal 100 F to 40 F. Resulting condensation removes tritiated vapor from the exhaust stack stream. The piping system includes a package outdoor air-cooled water chiller with parallel redundant circulating pumps; the condenser coil is located inside a shielded ventilation equipment cell. The tests verify correctmore » system operation and correct indications displayed by the central Monitor and Control System.« less
  • This represents a preoperational test report for Primary Ventilation Systems, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system provides vapor space filtered venting of tanks AY101, AY102, AZ101, AZ102. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System.
  • This represents a preoperational test report for Recirculation Ventilation Systems, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system provides vapor space cooling of tanks AY1O1, AY102, AZ1O1, AZ102 and supports the ability to exhaust air from each tank. Each system consists of a valved piping loop, a fan, condenser, and moisture separator; equipment is located inside each respective tank farm in its own hardened building. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System.