This supporting document has been prepared to make the FDNW calculations for Project W-320, readily retrievable. These calculations are required: To determine the power requirements needed to power electrical heat tracing segments contained within three manufactured insulated tubing assemblies; To verify thermal adequacy of tubing assembly selection by others; To size the heat tracing feeder and branch circuit conductors and conduits; To size protective circuit breaker and fuses; and To accomplish thermal design for two electrical heat tracing segments: One at C-106 tank riser 7 (CCTV) and one at the exhaust hatchway (condensate drain). Contents include: C-Farm electrical heat tracing; Cable ampacity, lighting, conduit fill and voltage drop; and Control circuit sizing and voltage drop analysis for the seismic shutdown system.
- Authors:
- Publication Date:
- Research Org.:
- Fluor Daniel Hanford Inc., Richland, WA (United States)
- Sponsoring Org.:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
- OSTI Identifier:
- 353333
- Report Number(s):
- HNF-2488
ON: DE99050909; BR: EW3130010; TRN: AHC29923%%165
- DOE Contract Number:
- AC06-96RL13200
- Resource Type:
- Technical Report
- Resource Relation:
- Other Information: PBD: 7 Aug 1998
- Country of Publication:
- United States
- Language:
- English
- Subject:
- 05 NUCLEAR FUELS; RADIOACTIVE WASTE STORAGE; STORAGE FACILITIES; WASTE RETRIEVAL; POWER SYSTEMS; CALCULATION METHODS; SPECIFICATIONS
Citation Formats
Bailey, J.W. Project W-320, 241-C-106 sluicing electrical calculations, Volume 2. United States: N. p., 1998.
Web. doi:10.2172/353333.
Bailey, J.W. Project W-320, 241-C-106 sluicing electrical calculations, Volume 2. United States. doi:10.2172/353333.
Bailey, J.W. Fri .
"Project W-320, 241-C-106 sluicing electrical calculations, Volume 2". United States.
doi:10.2172/353333. https://www.osti.gov/servlets/purl/353333.
@article{osti_353333,
title = {Project W-320, 241-C-106 sluicing electrical calculations, Volume 2},
author = {Bailey, J.W.},
abstractNote = {This supporting document has been prepared to make the FDNW calculations for Project W-320, readily retrievable. These calculations are required: To determine the power requirements needed to power electrical heat tracing segments contained within three manufactured insulated tubing assemblies; To verify thermal adequacy of tubing assembly selection by others; To size the heat tracing feeder and branch circuit conductors and conduits; To size protective circuit breaker and fuses; and To accomplish thermal design for two electrical heat tracing segments: One at C-106 tank riser 7 (CCTV) and one at the exhaust hatchway (condensate drain). Contents include: C-Farm electrical heat tracing; Cable ampacity, lighting, conduit fill and voltage drop; and Control circuit sizing and voltage drop analysis for the seismic shutdown system.},
doi = {10.2172/353333},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Fri Aug 07 00:00:00 EDT 1998},
month = {Fri Aug 07 00:00:00 EDT 1998}
}
-
This supporting document has been prepared to make the FDNW calculations for Project W-320, readily retrievable.
-
Project W-320, 241-C-106 sluicing: Civil/structural calculations. Volume 2
This supporting document has been prepared to make the FDNW calculations for Project W-320 readily retrievable. The Equipment Removal System (ERS) has been identified by WHC as not having any safety class 1 items present in the tank pits during equipment removal activities. Documentation of this finding is provided in Letter of Instruction 3/1 Analysis Requirements for Project W-320 Equipment Removal System (REF: LOI KGS-94-013). Based on this specific direction from WHC, 3/1 analysis for any component of the Project W-320 ERS is required. No further documentation of non-safety impacting safety items is required per DOE-RL Audit finding No. 90-02,more » -
Project W-320, 241-C-106 sluicing: Piping calculations. Volume 2
This supporting document has been prepared to make the FDNW calculations for Project W-320 readily retrievable. The objectives of this calculation are (1) To perform static and Safety Class 2 dynamic stress analysis of the Slurry and Supernate Process (inner) piping connecting Tanks 241-C-106 and 241-AY-102 in order to be in compliance with the Code requirements; (2) To assure the thermal expansion of the process pipe not be strained by the outer encasement pipe; and (3) To furnish process pipe support to the Civil Engineering group. -
Project W-320, 241-C-106 sluicing: Civil/structural calculations. Volume 1
This supporting document has been prepared to make the FDNW civil/structural calculations for Project W-320 readily retrievable. -
Project W-320, 241-C-106 sluicing: Civil/structural calculations. Volume 8
This supporting document has been prepared to make the FDNW civil/structural calculations for Project W-320 readily retrievable.