Title: Project W-320, 241-C-106 sluicing electrical calculations, Volume 2

Abstract

This supporting document has been prepared to make the FDNW calculations for Project W-320, readily retrievable. These calculations are required: To determine the power requirements needed to power electrical heat tracing segments contained within three manufactured insulated tubing assemblies; To verify thermal adequacy of tubing assembly selection by others; To size the heat tracing feeder and branch circuit conductors and conduits; To size protective circuit breaker and fuses; and To accomplish thermal design for two electrical heat tracing segments: One at C-106 tank riser 7 (CCTV) and one at the exhaust hatchway (condensate drain). Contents include: C-Farm electrical heat tracing; Cable ampacity, lighting, conduit fill and voltage drop; and Control circuit sizing and voltage drop analysis for the seismic shutdown system.

Authors:
Publication Date:
Research Org.:
Fluor Daniel Hanford Inc., Richland, WA (United States)
Sponsoring Org.:
USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
OSTI Identifier:
353333
Report Number(s):
HNF-2488
ON: DE99050909; BR: EW3130010; TRN: AHC29923%%165
DOE Contract Number:
AC06-96RL13200
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 7 Aug 1998
Country of Publication:
United States
Language:
English
Subject:
05 NUCLEAR FUELS; RADIOACTIVE WASTE STORAGE; STORAGE FACILITIES; WASTE RETRIEVAL; POWER SYSTEMS; CALCULATION METHODS; SPECIFICATIONS

Citation Formats

Bailey, J.W. Project W-320, 241-C-106 sluicing electrical calculations, Volume 2. United States: N. p., 1998. Web. doi:10.2172/353333.
Bailey, J.W. Project W-320, 241-C-106 sluicing electrical calculations, Volume 2. United States. doi:10.2172/353333.
Bailey, J.W. Fri . "Project W-320, 241-C-106 sluicing electrical calculations, Volume 2". United States. doi:10.2172/353333. https://www.osti.gov/servlets/purl/353333.
@article{osti_353333,
title = {Project W-320, 241-C-106 sluicing electrical calculations, Volume 2},
author = {Bailey, J.W.},
abstractNote = {This supporting document has been prepared to make the FDNW calculations for Project W-320, readily retrievable. These calculations are required: To determine the power requirements needed to power electrical heat tracing segments contained within three manufactured insulated tubing assemblies; To verify thermal adequacy of tubing assembly selection by others; To size the heat tracing feeder and branch circuit conductors and conduits; To size protective circuit breaker and fuses; and To accomplish thermal design for two electrical heat tracing segments: One at C-106 tank riser 7 (CCTV) and one at the exhaust hatchway (condensate drain). Contents include: C-Farm electrical heat tracing; Cable ampacity, lighting, conduit fill and voltage drop; and Control circuit sizing and voltage drop analysis for the seismic shutdown system.},
doi = {10.2172/353333},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Fri Aug 07 00:00:00 EDT 1998},
month = {Fri Aug 07 00:00:00 EDT 1998}
}

Technical Report:

Save / Share: