skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Project W-320, 241-C-106 sluicing: Construction specification W-320-C6

Abstract

This supporting document has been prepared to make the construction specifications for Project W-320 readily available. Project W-320, Waste Retrieval Sluicing System (WRSS), specification is for procurement, fabrication and installation of equipment at the C Tank Farm, including Operator Station and some equipment just outside the C Tank Farm fence, necessary to support the sluicing operation. Work consists of furnishing labor, equipment, and materials to provide the means to procure materials and equipment, fabricate items, excavate and place concrete, and install equipment, piping, wiring, and structures in accordance with the Contract Documents. Major work elements include: Excavation for process and fire protection piping, electrical conduit trenches, and foundations for small structures; Placement of concrete cover blocks, foundations, and equipment pads; Procurement and installation of double walled piping, electrical conduit, fire and raw water piping, chilled water piping, and electrical cable; Procurement and installation of above-ground ventilation system piping between the (HVAC) Process building and Tank C-106; Core drill existing concrete; Furnish and installation of electrical distribution equipment; Installation of the concrete foundation, and assembly installation of the two Seismic Shutdown Systems with Environmental Enclosures; Fabrication and installation of in-pit pipe jumpers, including related valves, instruments and wiring; and Installation ofmore » a vertical submersible pump, horizontal booster pump, and winch assembly into tank access riser pits.« less

Authors:
Publication Date:
Research Org.:
Fluor Daniel Hanford, Inc., Richland, WA (United States)
Sponsoring Org.:
USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States); USDOE Assistant Secretary for Nuclear Energy, Washington, DC (United States)
OSTI Identifier:
344972
Report Number(s):
HNF-2535
ON: DE99050839; BR: EW3130010; TRN: 99:004868
DOE Contract Number:  
AC06-96RL13200
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 20 Jul 1998
Country of Publication:
United States
Language:
English
Subject:
05 NUCLEAR FUELS; HANFORD RESERVATION; RADIOACTIVE WASTE STORAGE; WASTE RETRIEVAL; SPECIFICATIONS; MATERIALS HANDLING EQUIPMENT; PROCUREMENT; INSTALLATION; CONSTRUCTION; REMEDIAL ACTION

Citation Formats

Bailey, J.W. Project W-320, 241-C-106 sluicing: Construction specification W-320-C6. United States: N. p., 1998. Web. doi:10.2172/344972.
Bailey, J.W. Project W-320, 241-C-106 sluicing: Construction specification W-320-C6. United States. doi:10.2172/344972.
Bailey, J.W. Mon . "Project W-320, 241-C-106 sluicing: Construction specification W-320-C6". United States. doi:10.2172/344972. https://www.osti.gov/servlets/purl/344972.
@article{osti_344972,
title = {Project W-320, 241-C-106 sluicing: Construction specification W-320-C6},
author = {Bailey, J.W.},
abstractNote = {This supporting document has been prepared to make the construction specifications for Project W-320 readily available. Project W-320, Waste Retrieval Sluicing System (WRSS), specification is for procurement, fabrication and installation of equipment at the C Tank Farm, including Operator Station and some equipment just outside the C Tank Farm fence, necessary to support the sluicing operation. Work consists of furnishing labor, equipment, and materials to provide the means to procure materials and equipment, fabricate items, excavate and place concrete, and install equipment, piping, wiring, and structures in accordance with the Contract Documents. Major work elements include: Excavation for process and fire protection piping, electrical conduit trenches, and foundations for small structures; Placement of concrete cover blocks, foundations, and equipment pads; Procurement and installation of double walled piping, electrical conduit, fire and raw water piping, chilled water piping, and electrical cable; Procurement and installation of above-ground ventilation system piping between the (HVAC) Process building and Tank C-106; Core drill existing concrete; Furnish and installation of electrical distribution equipment; Installation of the concrete foundation, and assembly installation of the two Seismic Shutdown Systems with Environmental Enclosures; Fabrication and installation of in-pit pipe jumpers, including related valves, instruments and wiring; and Installation of a vertical submersible pump, horizontal booster pump, and winch assembly into tank access riser pits.},
doi = {10.2172/344972},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Mon Jul 20 00:00:00 EDT 1998},
month = {Mon Jul 20 00:00:00 EDT 1998}
}

Technical Report:

Save / Share: