skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Characterization of the 309 building fuel transfer pit and storage basin

Abstract

This document identifies radiological, chemical and physical conditions inside the Fuel Transfer Pit and Fuel Storage Basins. These spaces are located inside the Plutonium Recycle Test Reactor structure (309 Building.) The fuel handling and storage feature of the PRTR were primarily located in these spaces. The conditions were assessed as part of overall 309 Building transition.

Authors:
Publication Date:
Research Org.:
Fluor Daniel Hanford, Inc., Richland, WA (United States)
Sponsoring Org.:
USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States); USDOE Assistant Secretary for Nuclear Energy, Washington, DC (United States)
OSTI Identifier:
341308
Report Number(s):
HNF-2371
ON: DE99050597; BR: EX7003000; TRN: 99:004936
DOE Contract Number:
AC06-96RL13200
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 19 Mar 1998
Country of Publication:
United States
Language:
English
Subject:
05 NUCLEAR FUELS; FUEL STORAGE POOLS; PRTR REACTOR; MATERIALS HANDLING; EVALUATION; RADIATION MONITORING; DECOMMISSIONING

Citation Formats

Hale, N.S. Characterization of the 309 building fuel transfer pit and storage basin. United States: N. p., 1998. Web. doi:10.2172/341308.
Hale, N.S. Characterization of the 309 building fuel transfer pit and storage basin. United States. doi:10.2172/341308.
Hale, N.S. Thu . "Characterization of the 309 building fuel transfer pit and storage basin". United States. doi:10.2172/341308. https://www.osti.gov/servlets/purl/341308.
@article{osti_341308,
title = {Characterization of the 309 building fuel transfer pit and storage basin},
author = {Hale, N.S.},
abstractNote = {This document identifies radiological, chemical and physical conditions inside the Fuel Transfer Pit and Fuel Storage Basins. These spaces are located inside the Plutonium Recycle Test Reactor structure (309 Building.) The fuel handling and storage feature of the PRTR were primarily located in these spaces. The conditions were assessed as part of overall 309 Building transition.},
doi = {10.2172/341308},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Thu Mar 19 00:00:00 EST 1998},
month = {Thu Mar 19 00:00:00 EST 1998}
}

Technical Report:

Save / Share: