Title: W-026 acceptance test report plant control system hardware (submittal {number_sign} 220.C)

Technical Report ·
DOI:https://doi.org/10.2172/330743· OSTI ID:330743

Acceptance Testing of the WRAP1 Plant Control System Hardware was conducted throughout the construction of WRAPI with the final testing on the Process Area hardware being completed in November 1996. The hardware tests were broken out by the following functional areas; Local Control Units, Operator Control Stations in the WRAP Control Room, DMS Server, PCS Server, Operator Interface Units, printers, DMS terminals, WRAP Local Area Network/Communications, and bar code equipment. This document contains a completed copy of each of the hardware tests along with the applicable test logs and completed test exception reports.

Research Organization:
Fluor Daniel Hanford, Inc., Richland, WA (United States)
Sponsoring Organization:
USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
DOE Contract Number:
AC06-96RL13200
OSTI ID:
330743
Report Number(s):
HNF-SD-W026-ATR-022; ON: DE98059596; BR: 39EW31300; TRN: 97000106
Resource Relation:
Other Information: PBD: 14 Feb 1997
Country of Publication:
United States
Language:
English

Similar Records

W-026 acceptance test plan plant control system hardware (submittal {number_sign} 216)
Technical Report · Fri Feb 14 00:00:00 EST 1997 · OSTI ID:330743

W-026 acceptance test plan plant control system software (submittal {number_sign} 216)
Technical Report · Fri Feb 14 00:00:00 EST 1997 · OSTI ID:330743

W-026 acceptance test report plant control system software(submittal {number_sign}223.02)
Technical Report · Fri Feb 14 00:00:00 EST 1997 · OSTI ID:330743