skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Conceptual design report, TWRS Privatization Phase I, site development and roads, subproject W-505

Abstract

This document includes Conceptual Design Report (CDR) for the site development, construction of new roads and improvements at existing road intersections, habitat mitigation, roadway lighting, and construction power needed for the construction of two Private Contractor (PC) Facilities. Approximately 50 hectare (124 acres) land parcel, east of the Grout Facility, is planned for the PC facilities.

Authors:
Publication Date:
Research Org.:
Fluor Daniel Hanford, Inc., Richland, WA (United States)
Sponsoring Org.:
USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States); USDOE Assistant Secretary for Nuclear Energy, Washington, DC (United States)
OSTI Identifier:
330706
Report Number(s):
HNF-SD-W505-CDR-001
ON: DE99050006; BR: EW3130010; TRN: 99:003704
DOE Contract Number:  
AC06-96RL13200
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 5 Jun 1997
Country of Publication:
United States
Language:
English
Subject:
05 NUCLEAR FUELS; RADIOACTIVE WASTE FACILITIES; SITE PREPARATION; ROADS; POWER SYSTEMS; LIGHTING SYSTEMS

Citation Formats

Singh, G. Conceptual design report, TWRS Privatization Phase I, site development and roads, subproject W-505. United States: N. p., 1997. Web. doi:10.2172/330706.
Singh, G. Conceptual design report, TWRS Privatization Phase I, site development and roads, subproject W-505. United States. https://doi.org/10.2172/330706
Singh, G. 1997. "Conceptual design report, TWRS Privatization Phase I, site development and roads, subproject W-505". United States. https://doi.org/10.2172/330706. https://www.osti.gov/servlets/purl/330706.
@article{osti_330706,
title = {Conceptual design report, TWRS Privatization Phase I, site development and roads, subproject W-505},
author = {Singh, G},
abstractNote = {This document includes Conceptual Design Report (CDR) for the site development, construction of new roads and improvements at existing road intersections, habitat mitigation, roadway lighting, and construction power needed for the construction of two Private Contractor (PC) Facilities. Approximately 50 hectare (124 acres) land parcel, east of the Grout Facility, is planned for the PC facilities.},
doi = {10.2172/330706},
url = {https://www.osti.gov/biblio/330706}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Thu Jun 05 00:00:00 EDT 1997},
month = {Thu Jun 05 00:00:00 EDT 1997}
}