Title: Conceptual design report, TWRS Privatization Phase I, site development and roads, subproject W-505

Abstract

This document includes Conceptual Design Report (CDR) for the site development, construction of new roads and improvements at existing road intersections, habitat mitigation, roadway lighting, and construction power needed for the construction of two Private Contractor (PC) Facilities. Approximately 50 hectare (124 acres) land parcel, east of the Grout Facility, is planned for the PC facilities.

Authors:
Publication Date:
Research Org.:
Fluor Daniel Hanford, Inc., Richland, WA (United States)
Sponsoring Org.:
USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States); USDOE Assistant Secretary for Nuclear Energy, Washington, DC (United States)
OSTI Identifier:
330706
Report Number(s):
HNF-SD-W505-CDR-001
ON: DE99050006; BR: EW3130010; TRN: 99:003704
DOE Contract Number:
AC06-96RL13200
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 5 Jun 1997
Country of Publication:
United States
Language:
English
Subject:
05 NUCLEAR FUELS; RADIOACTIVE WASTE FACILITIES; SITE PREPARATION; ROADS; POWER SYSTEMS; LIGHTING SYSTEMS

Citation Formats

Singh, G. Conceptual design report, TWRS Privatization Phase I, site development and roads, subproject W-505. United States: N. p., 1997. Web. doi:10.2172/330706.
Singh, G. Conceptual design report, TWRS Privatization Phase I, site development and roads, subproject W-505. United States. doi:10.2172/330706.
Singh, G. Thu . "Conceptual design report, TWRS Privatization Phase I, site development and roads, subproject W-505". United States. doi:10.2172/330706. https://www.osti.gov/servlets/purl/330706.
@article{osti_330706,
title = {Conceptual design report, TWRS Privatization Phase I, site development and roads, subproject W-505},
author = {Singh, G.},
abstractNote = {This document includes Conceptual Design Report (CDR) for the site development, construction of new roads and improvements at existing road intersections, habitat mitigation, roadway lighting, and construction power needed for the construction of two Private Contractor (PC) Facilities. Approximately 50 hectare (124 acres) land parcel, east of the Grout Facility, is planned for the PC facilities.},
doi = {10.2172/330706},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Thu Jun 05 00:00:00 EDT 1997},
month = {Thu Jun 05 00:00:00 EDT 1997}
}

Technical Report:

Save / Share:
  • This document includes Conceptual Design Report (CDR) for extension of existing Raw and Potable systems from 200-East Area systems to two new private contractor facilities for immobilization and disposal of low-activity waste (LAW). The work will include design and installation of almost 3400 m (11,200 ft) of raw water pipe and 2200 in (7,300 ft) of potable water pipe.
  • This document includes Conceptual Design Report (CDR) for providing liquid effluent lines for routing waste from two Private Contractor (PC) facilities to existing storage, treatment, and disposal facilities in the 200-East Area.
  • To prepare for the privatization contractor development of their assigned sites, roads and rail system must be extended from the existing area network systems. Various road and rail modification alternatives were investigated through an engineering study, @C-SD-TWR-ES- 004, with the preferred transportation corridors identified. Various Site development alternatives were also investigated, WHC-SD-TWR-ES-003. The preferred alternative, as discussed herein, will: 1. Establish boundaries and set monuments for the two PC sites. All work within each designated site will be by the PC. 2. Assure that the systems to serve each site - Roads and Rail System Modifications, Raw and Potable Watermore » Service, Liquid Effluent Transfer Systems and Electric Power- are integrated with each other to best serve the sites. 3. Identify the corridors for Low Activity Waste (LAW) feed lines from the existing AP Tank Farm to the PC sites. Site development project will prepare these corridors for construction ofthe feed lines by the PC. Ifrequired, these corridors would include room for the optional High Level Waste (HLW) feed line. 4. Perform necessary site earthwork and grading outside of the PC sites. 1.3 DOCUMENT OVERVIEW This DRD will list the documents that will form the basis for design and construction of the roads and rail modifications and site development.« less
  • The DOE-RL is pursuing a strategy of hiring private contractors for treatment of Hanford Site tank wastes. This strategy is called privatization and includes design, permitting,construction, operation, and deactivation of facilities for tank waste treatment. The TWRS Privatization Infrastructure Project consists of several sub- projects which will provide key services needed to support the privatization mission. This document identifies the design requirements for the site development sub-project, including construction, power, water, and road modifications. It will be used in development of the project`s conceptual design.
  • The DOE-RL is pursuing a new business strategy of hiring private contractors for treatment of Hanford Site tank wastes. This strategy is called privatization and includes design, permitting , construction, operation and deactivation of facilities for tank waste treatment. The TWRS Privatization Infrastructure Project is part of the first phase of the initiative. It consists of several sub-projects which will provide key physical interfaces and services needed to support the privatization mission. One sub-project is to establish transport system changes needed to support the privatization initiative. Specifically, this study identifies the road and rail system modifications needed to service themore » privatization site in 2OOE; an area previously developed and characterized for Grout Disposal.« less