Title: Epoxy injection repairs to concrete in 225-B Building

Abstract

In 1982, the damaged anchor areas (67 total) in the Operating Gallery and cold manipulator shop ceiling reinforced concrete slabs were epoxy injection repaired by Construction Technology Laboratories (CTL), Portland Cement Association. The through depth vertical cracks (10 total) in the ceiling slabs in the galleries and manipulator shops were sealed and structurally repaired using epoxy injection procedures. The details of the epoxy reRair are reported. Sonic nondestructive (NDT) testing before and after the epoxy injection repairs were made by CTL to confirm that the repairs are structurally effective. CTL recommended to expedite the installation of lateral bracing for the manipulator monorail in order to avoid re-darnage to the repaired anchor areas.

Authors:
Publication Date:
Research Org.:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Org.:
USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
OSTI Identifier:
329790
Report Number(s):
WHC-SD-WM-ER-568
ON: DE98058409; BR: EW3135090; TRN: 96000913
DOE Contract Number:  
AC06-96RL13200
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 19 Sep 1996
Country of Publication:
United States
Language:
English
Subject:
36 MATERIALS SCIENCE; REINFORCED CONCRETE; REPAIR; EPOXIDES

Citation Formats

Vollert, F.R. Epoxy injection repairs to concrete in 225-B Building. United States: N. p., 1996. Web. doi:10.2172/329790.
Vollert, F.R. Epoxy injection repairs to concrete in 225-B Building. United States. doi:10.2172/329790.
Vollert, F.R. Thu . "Epoxy injection repairs to concrete in 225-B Building". United States. doi:10.2172/329790. https://www.osti.gov/servlets/purl/329790.
@article{osti_329790,
title = {Epoxy injection repairs to concrete in 225-B Building},
author = {Vollert, F.R.},
abstractNote = {In 1982, the damaged anchor areas (67 total) in the Operating Gallery and cold manipulator shop ceiling reinforced concrete slabs were epoxy injection repaired by Construction Technology Laboratories (CTL), Portland Cement Association. The through depth vertical cracks (10 total) in the ceiling slabs in the galleries and manipulator shops were sealed and structurally repaired using epoxy injection procedures. The details of the epoxy reRair are reported. Sonic nondestructive (NDT) testing before and after the epoxy injection repairs were made by CTL to confirm that the repairs are structurally effective. CTL recommended to expedite the installation of lateral bracing for the manipulator monorail in order to avoid re-darnage to the repaired anchor areas.},
doi = {10.2172/329790},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Thu Sep 19 00:00:00 EDT 1996},
month = {Thu Sep 19 00:00:00 EDT 1996}
}

Technical Report:

Save / Share: