Title: Utility advanced turbine systems (ATS) technology readiness testing and pre-commercialization demonstration

Technical Report ·
OSTI ID:293398

The overall objective of the Advanced Turbine System (ATS) Phase 3 Cooperative Agreement between GE and the U. S. Department of Energy (DOE) is the development of the GE 7H and 9H combined cycle power systems. The major effort will be expended on detail design. Validation of critical components and technologies will be performed including: hot gas path component testing, sub-scale compressor testing, steam purity test trials, and rotational heat transfer confirmation testing. Processes will be developed to support the manufacture of the first system, which will be sited and operated in Phase 4. Technology enhancements that are not required for the first machine design but will be critical for future ATS advances in performance, reliability, and costs will be initiated. Long-term tests of materials to confirm design life predictions will continue.

Research Organization:
USDOE Federal Energy Technology Center, Morgantown, WV (United States)
Sponsoring Organization:
USDOE Assistant Secretary for Fossil Energy, Washington, DC (United States)
DOE Contract Number:
FC21-95MC31176
OSTI ID:
293398
Report Number(s):
DOE/MC/31176-5515; ON: DE97002184
Resource Relation:
Other Information: PBD: Jul 1997