Title: Otec power plant for the Marshall Islands. Feasibility study phase 2. Project implementation. Final report. Export trade information

Technical Report ·
OSTI ID:270520

This report presents the results of phase 2 of a study which was conducted to assess the economic and design feasibility of a 5-10 MW OTEC power plant to be installed at Majuro, Marshall Islands. The document is divided into (1) Introduction; (2) Executive Summary; (3) Study Highlights, Conclusions, and Recommendations; (4) Phase 2 - Project Implementation Goals; (5) Study Task 1.0 - Project Planning; (6) Study Task 2.0 - Conceptual Design/Risk Reduction; (7) Preliminary Oceanographic and Site Survey; (8) List of References; (9) List of Appendices.

Research Organization:
Marine Development Associates, Inc., Saratoga, CA (United States)
OSTI ID:
270520
Report Number(s):
PB-96-153762/XAB; TRN: 61981983
Resource Relation:
Other Information: DN: This document was provided to NTIS by the U.S. Trade and Development Agency, Rosslyn, VA; PBD: 25 Mar 1996
Country of Publication:
United States
Language:
English