Otec power plant for the Marshall Islands. Feasibility study phase 2. Project implementation. Final report. Export trade information
Technical Report
·
OSTI ID:270520
This report presents the results of phase 2 of a study which was conducted to assess the economic and design feasibility of a 5-10 MW OTEC power plant to be installed at Majuro, Marshall Islands. The document is divided into (1) Introduction; (2) Executive Summary; (3) Study Highlights, Conclusions, and Recommendations; (4) Phase 2 - Project Implementation Goals; (5) Study Task 1.0 - Project Planning; (6) Study Task 2.0 - Conceptual Design/Risk Reduction; (7) Preliminary Oceanographic and Site Survey; (8) List of References; (9) List of Appendices.
- Research Organization:
- Marine Development Associates, Inc., Saratoga, CA (United States)
- OSTI ID:
- 270520
- Report Number(s):
- PB-96-153762/XAB; TRN: 61981983
- Resource Relation:
- Other Information: DN: This document was provided to NTIS by the U.S. Trade and Development Agency, Rosslyn, VA; PBD: 25 Mar 1996
- Country of Publication:
- United States
- Language:
- English
Similar Records
Definitional mission: Ocean Thermal Energy Conversion, Republic of the Marshall Islands. Export trade information
Suizhong 36-1 offshore oilfield, Liaodong Bay, the People's Republic of China. Production engineering report, part 1. Gravel packing and completion design. Export trade information
Feasibility study on Thailand LNG project. Final report. Volume 2. Appendix. Export trade information
Technical Report
·
Sat Sep 01 00:00:00 EDT 1990
·
OSTI ID:270520
Suizhong 36-1 offshore oilfield, Liaodong Bay, the People's Republic of China. Production engineering report, part 1. Gravel packing and completion design. Export trade information
Technical Report
·
Thu Jun 01 00:00:00 EDT 1989
·
OSTI ID:270520
Feasibility study on Thailand LNG project. Final report. Volume 2. Appendix. Export trade information
Technical Report
·
Tue Aug 01 00:00:00 EDT 1995
·
OSTI ID:270520